My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ALL AMERICAN ASPHALT (BRISTOL STREET WIDENING FROM 2ND ST. TO 10TH ST.)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
ALL AMERICAN ASPHALT (BRISTOL STREET WIDENING FROM 2ND ST. TO 10TH ST.)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2024 5:45:50 PM
Creation date
2/5/2013 8:44:36 AM
Metadata
Fields
Template:
Contracts
Company Name
ALL AMERICAN ASPHALT (BRISTOL STREET WIDENING FROM 2ND ST. TO 10TH ST.)
Contract #
Various
Agency
Public Works
Council Approval Date
1/22/2013
Destruction Year
2018
Notes
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJ. NO. 08 -1700, 12 -6421 8c 12 -6422 <br />ADDENDUM No. ONE <br />CITY OF SANTA ANA November 1, 2012 <br />PROJECT NO. 08 -1700, 12 -6421 AND 12 -6422 <br />PROPOSAL 8r CONTRACT AGREEMENT <br />BID PROPOSAL, continued <br />Item # Bid Item Unit Quantity Unit Price Amount <br />92. 6" Fire Line Connection Including 6" <br />Project No. 12 -6422 Schedule B Subtotal <br />TO BE INCLUDED IN BID PACKAGE <br />BP 7 of 20 <br />RWGV (Resilient Wedge Gate Valve) and <br />EA <br />1 <br />$ 1 -1-70 <br />$ l-li�- <br />6" Single Check Detector Valve Assembly <br />per plan. <br />93. <br />6" Fire Line Connection Including 6" <br />EA <br />1 <br />$ �o��_ <br />$ `ao3o^ <br />RWGV (Resilient Wedge Gate Valve) <br />94. <br />Construct 8" Gate Valve <br />EA <br />4 <br />$ X5-'13 <br />$ i �2�'i 2-- <br />95. <br />Construct 12" Gate Valve <br />EA <br />11 <br />$ 4-190 <br />$ 4-�h�� <br />96. <br />Construct Steel Casing <br />EA <br />1 <br />$ 8��� <br />$ 43`u5a - <br />97 <br />Construct Fire Hydrant per C.S.A. Std. <br />EA <br />10 <br />$ \Qd�� - <br />$ ldc��- <br />Plan No. 1405 <br />Project No. 12 -6421 Schedule ASubtotal ---------------------------------- - - - - -- $ <br />'7ZZ �l2 "�" <br />Proiect 12 -6422 (Sewer) Schedule B <br />98. <br />Abandon Existing Sewer Manhole <br />EA <br />5 <br />$ '�.c3.d --i � <br />$ l �3"Z -o- <br />99. <br />Construct New Manhole Per C.S.A. Std. <br />EA <br />5 <br />$ ���� <br />$"Z33m- <br />Plan No. 1201 <br />100. <br />Construct 4" Sewer Lateral per C.S.A. <br />EA <br />2 <br />$ —j out - <br />$ (� Oo`l - <br />Std. Plan No. 1204 <br />1 O 1 . <br />Abandon Existing Sewer Lateral <br />EA <br />44 <br />$ � -7 2 <br />$ 3'3aj �$ <br />Project No. 12 -6422 Schedule B Subtotal <br />TO BE INCLUDED IN BID PACKAGE <br />BP 7 of 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.