My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ALL AMERICAN ASPHALT (BRISTOL STREET WIDENING FROM 2ND ST. TO 10TH ST.)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
ALL AMERICAN ASPHALT (BRISTOL STREET WIDENING FROM 2ND ST. TO 10TH ST.)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2024 5:45:50 PM
Creation date
2/5/2013 8:44:36 AM
Metadata
Fields
Template:
Contracts
Company Name
ALL AMERICAN ASPHALT (BRISTOL STREET WIDENING FROM 2ND ST. TO 10TH ST.)
Contract #
Various
Agency
Public Works
Council Approval Date
1/22/2013
Destruction Year
2018
Notes
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PUBLIC WORKS AGENCY <br />CONTRACT CHANGE ORDER <br />Project Number 08 -1700: Bristol Street Widening From 2nd St. To loth St. Change Order Number 1 <br />To All American Asphalt, Inc. Contractor <br />You are hereby directed to make the herein changes from the plans and specifications or do the following described work not included in the plans and <br />specifications on this contract. <br />NOTE: THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCIL OR CITY MANAGER. <br />Unless otherwise staled, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. <br />Change requested by <br />EXTRA WORK AT AGREED PRICES <br />PUBLIC WORKS AGENCY <br />1. Increase the height of 257 LF of soundwall located on the west side of Bristol between <br />7th & 8th Streets as shown on revised plan sheet SW -03 dated 5/1/2013. (PCO #06) <br />AGREED PRICE $ 1,698 <br />2. Construct one ductile iron vertical offset in the 8" water main located on 5th Street and <br />one ductile iron vertical offset in the 12" water main located on Santa Ana Blvd. as <br />directed in response to RFI #04 dated 5/2/2013. (PCO #08) <br />AGREED PRICE $ 56,700 <br />3. Remove boundary fence and wall located on the west side of Bristol between 9th & 10th <br />Streets as directed in PCO #09 dated 5/8/2013. <br />AGREED PRICE $ 7,100 <br />4. Install type 24 -4 -100 traffic signal pole with a 35' mast arm in lieu of the proposed 19 -4- <br />100 with a 30' mast arm on the southwest corner of Santa Ana Blvd. and Bristol as <br />shown on revised plan sheet XA -01 dated 4/10/2013. (PCO #02) <br />AGREED PRICE $ 1,928 <br />5. Remove PCC foundations encountered in the planting pits for palm trees on the east <br />side of Bristol and modify irrigation to add 2 additional bubblers for palm trees at 5 <br />locations as directed in PCO #03 4/17/2013. This work was done on a time and <br />materials basis. <br />FINAL COST = $ 9,175 <br />6. Install a temporary asphalt sidewalk on the west side of Bristol north of 6th Street as <br />directed in PCO #05 dated 5/2/2013. This work was done on a time and materials basis. <br />FINAL COST = $ 2,732 <br />Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.