My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ALL AMERICAN ASPHALT (BRISTOL STREET WIDENING FROM 2ND ST. TO 10TH ST.)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
ALL AMERICAN ASPHALT (BRISTOL STREET WIDENING FROM 2ND ST. TO 10TH ST.)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2024 5:45:50 PM
Creation date
2/5/2013 8:44:36 AM
Metadata
Fields
Template:
Contracts
Company Name
ALL AMERICAN ASPHALT (BRISTOL STREET WIDENING FROM 2ND ST. TO 10TH ST.)
Contract #
Various
Agency
Public Works
Council Approval Date
1/22/2013
Destruction Year
2018
Notes
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MEMORANDUM <br />To: <br />From: <br />David Cavazos <br />City Manager <br />William Galvez, Interim Executive Director <br />Public Works Agency <br />Date: January 27, 2014 <br />Project Nos. 08 -1700, 12 -6421, 12 -6422 <br />Bristol Street Widening From 2nd Street to 10th Street <br />Subject: Change Order No. 3 <br />CONTRACTOR : All American Asphalt <br />8 <br />PO Box 2229 <br />Corona, CA 92878, <br />PROJECT DESCRIPTION: 08 -1700; Bristol Street Widening from 2nd Street To 1119ih:Straet, <br />12- 6421;Bristol Street Water Main Improvements from +' St�det to <br />10th Street, 12 -6422; Bristol Street Sewer Main Improvements from <br />3`d Street to 10th Street. <br />CHANGE ORDER NUMBER: 3 <br />CHANGE ORDER AMOUNT: $ 104,294.60 <br />ACCOUNTING UNIT-ACCOUNT- ACTIVITY NUMBER: 05917661- 66220 - 08170001028 <br />03217662- 66220- 08170002028 <br />03017660 - 66220 - 08170003028 <br />06617647- 66220 - 12642101028 <br />JUSTIFICATION <br />EXTRA WORK AT TIME & MATERIALS <br />1. After the start of construction, revised storm drain plans for the laterals at 3rd Street <br />were issued. The revisions changed the alignment of the 18" Reinforced Concrete Pipe <br />(RCP) laterals designated on the plans as "B" & "C ", relocated the junction structure 50' <br />north and added a transition structure where the new 36" RCP joins the existing 54" <br />RCP. This work was done on a time and materials basis. <br />FINAL COST $ 13,070.56 <br />2. The contract documents require the native soil be used for backfill for the storm drain <br />pipe. During excavation for the 36" RCP storm drain on the east side of Bristol, the <br />native soil that was encountered was unsuitable for backfill. This soil needs to be <br />removed and suitable soil brought in. This work was done on a time and materials <br />basis. (PCO #22) <br />FINAL COST $ 19,796.65 <br />
The URL can be used to link to this page
Your browser does not support the video tag.