My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ALL AMERICAN ASPHALT (BRISTOL STREET WIDENING FROM 2ND ST. TO 10TH ST.)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
ALL AMERICAN ASPHALT (BRISTOL STREET WIDENING FROM 2ND ST. TO 10TH ST.)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2024 5:45:50 PM
Creation date
2/5/2013 8:44:36 AM
Metadata
Fields
Template:
Contracts
Company Name
ALL AMERICAN ASPHALT (BRISTOL STREET WIDENING FROM 2ND ST. TO 10TH ST.)
Contract #
Various
Agency
Public Works
Council Approval Date
1/22/2013
Destruction Year
2018
Notes
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PUBLIC WORKS AGENCY <br />CONTRACT CHANGE ORDER <br />Project Number 08 -1700: Bristol Street Widening From 2nd St. To 10th St. Change Order Number 3 <br />To All American Asphalt, Inc. Contractor <br />You are hereby directed to make the herein changes from the plans and specifications or do the following described work not included in the plans and <br />specifications on this contract. <br />NOTE: THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCIL OR CITY MANAGER. <br />Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle lime. <br />Change requested by PUBLIC WORKS AGENCY <br />EXTRA WORK AT TIME & MATERIALS <br />Construct junction chamber as shown on revised plan SD -01 & SD -05 dated 5/7/2013. <br />(PCO #07) <br />FINAL COST $ 13,070.56 <br />Remove unsuitable soil from 36" storm drain trench and backfill with suitable soil. (PCO <br />#22) <br />FINAL COST $ 19,796.65 <br />Excavate failed trench walls, install shoring and support for existing waterline, trench by <br />hand and backfill. (PCO #28) <br />FINAL COST $ 13,968.58 <br />EXTRA WORK AT AGREED PRICE <br />Install two straight luminaire arms in lieu of the specified curved arms (PCO #24) and modify <br />two type 15 poles as directed in PCO #16 to avoid overhead high - voltage power lines. <br />AGREED PRICE = $5092.50 <br />Remove previously installed 60' mast arm and provide and install a 65' mast arm per <br />revised plan XA -03 dated 10/29/13 (PCO #21) <br />AGREED PRICE = $21,228 <br />Install 2 Forte[® VCalm® radar speed limit signs and controlling devices and software as <br />directed in PCO #25 dated 11/1/2014 <br />AGREED PRICE $31,138.31 <br />Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.