My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2013-02-19
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
02/19/2013
>
FULL PACKET_2013-02-19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2017 4:29:24 PM
Creation date
2/14/2013 6:07:44 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
2/19/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
240
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Kenny Nguyen <br />February 2, 2012 <br />Page 3 of 3 <br />• Place security gates on bridges that lead to Third/Broadway parking structure (2 places). In <br />addition, place mesh on railings leading to the bridges to secure openings. <br />Note: ADA access will not be checked for the garages. <br />The total cost of the service is $27,110. This cost is based on the following breakdown: <br />Engineering/Mgmt $ 5,300 <br />Architectural Engr $ 15,160 <br />Electrical Engr $ 3,650 <br />Structural Engr $ 1,500 <br />Cost Estimate $ 1.500 <br />Total Cost (this location): $ 27,110 <br />Summary of Costs: <br />77 & Spurgeon (Fiesta Marketplace): $ 16,750 <br />Other Structures: $ 27.110 <br />Total Costs (with optional work) $ 43,860 <br />Please review the proposal and let me if you would like to discuss the contract and total costs. Also, <br />would like to thank you for the opportunity to provide this proposal and to assist the City. Our team is <br />looking forward to the work. <br />Sincerely, <br />Gregory W. Hefter <br />Project Manger <br />AECOM <br />25C-8
The URL can be used to link to this page
Your browser does not support the video tag.