My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SIEMENS INDUSTRY, INC.
Clerk
>
Contracts / Agreements
>
PROJECTS
>
Completed Projects
>
SIEMENS INDUSTRY, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2024 3:12:39 PM
Creation date
2/26/2013 11:32:07 AM
Metadata
Fields
Template:
Contracts
Company Name
Siemens Industry, Inc.
Contract #
Various
Agency
Public Works
Council Approval Date
2/14/2013
Expiration Date
2/28/2014
Notes
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TOTAL BASE BID FOR PROJECT: 12 -6758 AND 12 -6759; ,,,, , , , _ r <br />ADD ALTERNATIVE A — PROJECT: 12 -6759 <br />Item # <br />Bid Item <br />*45. Install New Sign <br />*46. Remove Existing Sign and Install New Sign <br />*47. Remove Existing Sign <br />*48• Remove Existing Street Name Sign and Install <br />New Street Name Sign <br />*49. Remove Existing Sign and Install New Sign on <br />Traffic Signal <br />Unit Quantity Unit Price <br />EA 4 $ <br />EA 78 $- <br />EA 2 $ <br />n � <br />EA 25 $ !�? �- <br />EA 20 $ <br />*50. Remove Existing Reflective Street Name Sign <br />and Install New Reflective Street Name Sign <br />on Traffic Signal Mast Arm EA 6 $ Altr_ <br />Amount <br />2 00 <br />$ 2 00 <br />ca <br />W <br />.y <br />r <br />TOTAL ADD ALTERNATIVE A FOR PROJECT NUMBER: 12 -6759: <br />TOTAL BASE BID PLUS ADD ALTERNATIVE A: <br />The lowest responsible bidder shall be selected based on the Total Base Bid. The City reserves the right <br />to award the Base Bid, and any, all or none of the Alternative Bid Items. <br />* The quantity for this bid item is shown for bid comparison only. This bid item shall not be subject to <br />the "25 %" limit as stated in Section 3 -2 of the latest Standard Specifications for Public Works <br />Construction. The actual amount for this item will be dictated by the actual quantity used, and the <br />Agency reserves the right to increase or decrease the quantity of this item accordingly. <br />TO BE INCLUDED IN BID PACKAGE <br />BP 4 of 30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.