Laserfiche WebLink
Center- Gpldstone, San Clemente Island, San Nicholas Island, <br />Susanville Federal Prison, 29 Palms - Marine Corps, U.S. Marine <br />Base - Barstgw, U.S. Naval Air Facility - Sealey, Vandenberg AFB <br />$4.00 additional per hour at the following locations: <br />Army Defense Language Institute - Monterey, Fallon Air Base, <br />Naval Post Graduate School - Monterey, Yermo Marine Corps <br />Logistics Center <br />$2.00 additional per hour at the following locations: <br />Port Hueneme, Port Mugu, U.S. Coast Guard Station - Two Rock <br />LABO0300 -001 07/01/2012 <br />Rates Fringes <br />Brick Tender .....................$ 27.17 17.36 <br />---------------------------------------------------------------- <br />LAB00300 -003 07/01/2012 <br />Rates Fringes <br />LABORER (GUNITE) <br />GROUP <br />1 .....................$ <br />30.04 <br />14.20 <br />GROUP <br />2 .....................$ <br />29.09 <br />14.20 <br />GROUP <br />3 .....................$ <br />25.55 <br />14.20 <br />LABORER (TUNNEL) <br />GROUP <br />1 .....................$ <br />33.69 <br />17.35 <br />GROUP <br />2 .....................$ <br />34.01 <br />17.35 <br />GROUP <br />3 .....................$ <br />34.47 <br />17.35 <br />GROUP <br />4 .....................$ <br />35.16 <br />17.35 <br />LABORER <br />GROUP <br />1 .....................$ <br />28.09 <br />15.77 <br />GROUP <br />2 .....................$ <br />28.64 <br />15.77 <br />GROUP <br />3 .....................$ <br />29.19 <br />15.77 <br />GROUP <br />4 .....................$ <br />30.74 <br />15.77 <br />GROUP <br />5 .....................$ <br />31.09 <br />15.77 <br />FOOTNOTE: GUNITE PREMIUM PAY: Workers working from a <br />Bosn'n's Chair or suspended from a rope or cable shall <br />receive 40 cents per hour above the foregoing applicable <br />classification rates. Workers doing gunite and /or <br />shotcrete work in a tunnel shall receive 35 cents per hour <br />above the foregoing applicable classification rates, paid <br />on a portal -to- portal basis. Any work performed on, in or <br />above any smoke stack, silo, storage elevator or similar <br />type of structure, when such structure is in excess of <br />75' -0" above base level and which work must be performed in <br />whole or in part more than 75' -0" above base level, that <br />work performed above the 75' -0" level shall be compensated <br />for at 35 cents per hour above the applicable <br />classification wage rate. <br />LABORER CLASSIFICATIONS <br />GROUP 1: Cleaning and handling of panel forms; Concrete <br />screeding for rough strike -off; Concrete, water curing; <br />Demolition laborer, the cleaning of brick if performed by cz <br />worker performing any other phase of demolition work, and <br />the cleaning of lumber; Fire watcher, limber, brush loader, <br />piler and debris handler; Flag person; Gas, oil and /or <br />water pipeline laborer; Laborer, asphalt- rubber material <br />loader; Laborer, general or construction; Laborer, general <br />clean -up; Laborer, landscaping; Laborer, jetting; Laborer, <br />temporary water and air lines; Material hose operator <br />(walls, slabs, floors and decks); Plugging, filling of shee <br />bolt holes; Dry packing of concrete; Railroad maintenance, <br />repair track person and road beds; Streetcar and railroad <br />construction track laborers; Rigging and signaling; Scaler; <br />Slip form raiser; Tar and mortar; Tool crib or tool house <br />laborer; Traffic control by any method; Window cleaner; <br />Wire mesh pulling - all concrete pouring operations <br />GROUP 2: Asphalt shoveler; Cement dumper (on 1 yd. or larger <br />mixer and handling bulk cement); Cesspool digger and <br />installer; Chucktender; Chute handler, pouring concrete, <br />the handling of the chute from readymix trucks, such as <br />walls, slabs, decks, floors, foundation, footings, curbs, <br />http: / /www.wdol.gov /wdol /scafiles /davisbacon /ca35.dvb[11 /13/2012 6:38:45 AM] <br />