My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PACIFIC CONSTRUCTION COMPANY, INC.
Clerk
>
Contracts / Agreements
>
PROJECTS
>
Completed Projects
>
PACIFIC CONSTRUCTION COMPANY, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2024 3:09:59 PM
Creation date
2/26/2013 12:12:30 PM
Metadata
Fields
Template:
Contracts
Company Name
Pacific Construction, Co., Inc.
Contract #
Various
Agency
Public Works
Council Approval Date
2/19/2013
Expiration Date
11/22/2013
Notes
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROJECT NO. 13 -7513: EL SALVADOR PARK WALKWAY RECONSTRUCTION <br />PROJECT NO. 13 -7514: WINDSOR PARK WALKWAY RECONSTRUCTION <br />PROPOSAL & CONTRACT AGREEMENT <br />BID PROPOSAL <br />TO: CITY COUNCIL OF THE CITY OF SANTA ANA <br />FROM: -FA C—) F( L C0i\J1;T"GTI6✓J • , /�L <br />REQUIREMENT: <br />The undersigned declares that he /she has carefully examined the location of the proposed work, that <br />he /she has examined the Plans and Specifications and read the accompanying instruction to BIDDERS, <br />and hereby proposes to furnish all material and do all the work required to complete the said work in <br />accordance with said plans, specifications and special provisions, for the unit price(s) or lump sum(s) set <br />forth in the following schedule: <br />Item # <br />Bid Item <br />Unit <br />Quantity <br />Unit Price <br />Amount <br />1. <br />Unclassified Excavation <br />CY <br />270 <br />$ <br />$20., ZSo <br />2. <br />Cold Milling (2 ") <br />SF <br />23,000 <br />$ i%• 50 <br />$ 11, sd0 <br />3. <br />PCC Walkway (4 ") <br />SF <br />34,000 <br />$ 3-5-0 <br />$ D b0 <br />4. <br />Decomposed Granite with Stabilizer <br />SF <br />8,750 <br />$ <br />(3 „) <br />5. <br />Redwood Header <br />LF <br />300 <br />$� 2 <br />$ O <br />6. <br />Root Shave <br />EA <br />6 <br />$ 41b <br />$ 00 <br />7. Adjust Water Valve Box Frame and EA 1 $ 200 $ ZOO <br />Cover to Finished Grade <br />8. Adjust Pull Box to Finished Grade EA 2 $ 2 L,,) L9 $ od <br />9. Temporary Construction Sign EA 4 $ 15-0 $ 6 CO <br />10. Irrigation Sleeve LS 1 $ 700 $ 00 <br />oa <br />TOTALBID--------------------------------------------------------------------------- - - - - -- $2 SS <br />TO BE INCLUDED IN BID PACKAGE <br />BP 1 of 30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.