My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PACIFIC CONSTRUCTION COMPANY, INC.
Clerk
>
Contracts / Agreements
>
PROJECTS
>
Completed Projects
>
PACIFIC CONSTRUCTION COMPANY, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2024 3:09:59 PM
Creation date
2/26/2013 12:12:30 PM
Metadata
Fields
Template:
Contracts
Company Name
Pacific Construction, Co., Inc.
Contract #
Various
Agency
Public Works
Council Approval Date
2/19/2013
Expiration Date
11/22/2013
Notes
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE AMERICAN INSTITUTE OF ARCHITECTS <br />A!A Document A310 <br />• : • • <br />KNOW ALL MEN BY THESE PRESENTS. that we <br />Harry Minassian, Inc. dba Pacific Construction Co., Inc. <br />10910 Densmore Avenue <br />Granada Hills , CA 91344 <br />as Principal, hereinafter called the Principal, and <br />North American Specialty Insurance Company <br />6 Hutton Center Drive, Suite 850 <br />Santa Ana , CA 92707 <br />a corporation duly organized under the laws of the State of New Hampshire <br />as Surety, hereinafter called the Surety, are held and firmly bound unto <br />City of Santa Ana <br />20 Civic Center Plaza, Santa Ana, CA 92707 <br />as Obligee, hereinafter called the Obligee, in the sum of <br />Bond Number: HARMI -194 <br />Ten Percent of Amount Bid Dollars ($ 10% of Amount Bid <br />for the payment of which sum well and truly to be made, the said Principal and the said Surety, bind ourselves, our <br />heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. <br />WHEREAS, the Principal has submitted a bid for: <br />Project No. 13 -7513 & 13 -7514 - El Salvador Park Walkway Reconstruction & Windsor Park Walkway Reconstruction <br />NOW, THEREFORE, if the Obligee shall accept the bid of the Principal and the Principal shall enter into a Contract <br />with the Obligee in accordance with the terms of such bid, and give such bond or bonds as may be specified in the <br />bidding or Contract Documents with good and sufficient surety for the faithful performance of such Contract and for <br />the prompt payment of labor and material furnished in the prosecution thereof, or in the event of the failure of the <br />Principal to enter such Contract and give such bond or bonds, if the Principal shall pay to the Obligee the difference <br />not to exceed the penalty hereof between the amount specified in said bid and such larger amount for which the <br />Obligee may in good faith contract with another party to perform the Work covered by said bid, then this obligation <br />shall be null and void, otherwise to remain in full force and effect. <br />Signed and sealed this 15th day of January, 2013 <br />(Witness) <br />(IMtness) <br />Harry ssi n d a Pac c �ction . <br />n (Seal) <br />iD0rJ <br />(Title) <br />North A S ecialty Insurance Company <br />r (sue (Seat) <br />Attorney -in -Fact <br />AIA DOCUMENT A310 • BID BOND • AIA 0 • FEBRUARY 1970 ED • THE AMERICAN <br />INSTITUTE OF ARCHFFECTS, 1735 N.Y. AVE., N.W., WASHINGTON, D.C. 201306 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.