Laserfiche WebLink
Request for Approval of Change Order No. 1 <br />October 21, 2013 <br />Project Nos.: 137513 & 137514 <br />Page 3 of 3 <br />CHANGE ANALYSIS <br />DETAILED JUSTIFICATION <br />The concrete walkways at El Salvador and Windsor Parks have deteriorated due to <br />weather, age and usage; which have become a concern at the parks. The replacement <br />of these walkways will restore the walkways for the park visitors. The improvements <br />include removal of existing asphalt and placement of portland cement walkways and <br />decomposed granite areas. Due to the limited funding compared to the original <br />engineer's estimate certain improvements were deleted from the final design. <br />Consequently with the bids coming in lower than expected, Parks, Recreation and <br />Community Services staff recognized this opportunity to utilize the grant funds and add <br />the parking lot enhancement: A prior approval was granted for this work on May 7, 2013. <br />The work included pulverizing the asphalt, grading, paving, restriping and an ADA curb <br />ramp. Also, a temporary portable restroom for public use was during these renovations. <br />REVISED DETAILS <br />Rehabilitate Parking lot including restriping and ADA curb ramp at El Salvador <br />Park: <br />cmc cep oR <br />EL SALVADOR PARK <br />PARKING LOT <br />eB j <br />Rl.LL'N - POfRg3fFLL 311iRYi <br />