My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CHAMBERS GROUP, INC. - 2013
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2022
>
CHAMBERS GROUP, INC. - 2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2018 4:12:54 PM
Creation date
2/26/2013 4:26:28 PM
Metadata
Fields
Template:
Contracts
Company Name
CHAMBERS GROUP, INC.
Contract #
A-2013-007
Agency
PUBLIC WORKS
Council Approval Date
1/7/2013
Expiration Date
12/31/2013
Insurance Exp Date
6/1/2015
Destruction Year
2022
Notes
Amended by A-2013-007-01, -02, 03
Document Relationships
CHAMBERS GROUP, INC. 2A
(Amended By)
Path:
\Contracts / Agreements\C
CHAMBERS GROUP, INC. 2B
(Amended By)
Path:
\Contracts / Agreements\C
CHAMBERS GROUP, INC. 2C
(Amended By)
Path:
\Contracts / Agreements\C
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
resources literature reviews, and preparation of reports meeting county, state and federal <br />requirements. <br />Year Completed: Ongoing <br />Client Name: Orange County Public Works <br />Contact: Rory Pastor <br />Telephone Number: (714) 647-3912 <br />♦ �'"i.f t <br />lane on Jamboree Road between 1-405 northbound ramps and Kelvin Avenue. <br />The project will fulfill requirements of the Irvine Business Complex (IBC) Vision Plan, approved by the <br />City of Irvine in July 2010. The IBC Vision Plan provides the guidelines for development within the City <br />including the improvements at the Jamboree Road and Main Street intersection. <br />The engineering work included the preparation of a Project Report for the improvements, detailing the <br />street widening improvements, landscape impacts, utility impacts and right of way impacts. The Project <br />Report also included traffic flow analysis, construction staging and CEQA environmental clearance. <br />Chambers Group prepared a Mitigated Negative Declaration (MND) for the environmental clearance. <br />Chambers Group was responsible for the environmental technical reports/studies used in the <br />preparation of the MND, which included: aesthetics, air quality, biological resources, cultural resources, <br />greenhouse gas emissions, land use/planning, noise, and public services and utilities. <br />All of the proposed improvements occur within the City of Irvine right of way, no physical changes will <br />be made within the Caltrans right of way. The overall length of the project area along Jamboree Road is <br />approximately 2,200 feet (0.4 miles). The proposed improvements within the project area include street <br />widening to provide additional travel lanes (primarily at the intersection of Jamboree Road and Main <br />Street), traffic signal modifications, center median modifications, construction of a new retaining wall, <br />utility modifications, parkway improvements, flood control channel widening and private property <br />modifications. <br />Year Completed: On-going (2013 completion) <br />Client Name: Civil Works Engineers, Inc. <br />Contact: Dave Grantham <br />Telephone Number: (714) 966-9060 <br />Fusee de Valencia, Laguna Fulls; C <br />The proposed street widening project included the improvement of Paseo de Valencia between Laguna <br />Hills Drive and Kennington Drive. The length of proposed improvements along Paseo de Valencia is <br />approximately 2,200 feet or approximately 0.4 miles. <br />t. <br />CHAMBERS <br />19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.