Laserfiche WebLink
COOPERATIVE AGREEMENT NO. C-2-2030 <br />ATTACHMENT A <br />and Requirements for allowed systems and sub systems, sole source, and design <br />requirements for all equipment to be installed.); and <br />5. Attention is directed to Section 86 — 1.05 WARRANTIES, GUARANTIES, and <br />INSTRUCTION SHEETS of the State Standard Specifications. <br />CONSULTANT shall provide the following: <br />a. 1 YEAR GUARANTEE on LABOR and MATERIAL for all equipment <br />furnished, installed, and/or modified <br />b. 3 YEAR GUARANTEE on Firmware and Software Patches, Fixes, Updates, <br />and Upgrades for <br />o Central Systems Control and Communications, <br />o Field Master, and Local intersection controller units <br />Maintenance Contracts or extra fees for these specific tasks and deliverables shall not <br />be allowed nor charged to any PARTY or AGENCY by either the CONSULTANT, <br />his/her Sub — Consultants, and/or vendors/suppliers, either jointly or severally, of the <br />specified systems and related components for this service or task. <br />Enforcement of Standard Warranties or Guaranties for hardware and software or <br />firmware specified heretofore shall be the sole responsibility of the AGENCY <br />receiving the equipment. <br />Deliverables — Task 7: <br />1. Procure and install any and all equipment as specified but within budget for the <br />PROJECT as proposed in the Scope of Work and Attachments or Appendices. <br />2. Negotiate with APM and AGENCY representatives on alternative procurements or <br />substitutions as deemed necessary during the course of the PROJECT. <br />3. AS BUILT Plans and Specifications. <br />4. All WARRANTIES and GUARANTIES as specified <br />Task 8: Continuing Signal Timing Support <br />CONSULTANT will provide "on -call" signal timing support services for a period of two <br />years or 24 months following the implementation and fine — tuning of the final signal <br />timing plans, Task 5, to address any future adjustments that may be needed during this <br />period. Depending on the nature of the adjustment, CONSULTANT may accomplish the <br />fine-tuning adjustments remotely from the Consultant's office through the traffic <br />management systems. During this 24-month period CONSULTANT will be prepared to <br />review any project intersection requested by the PARTIES within (24) hours of written <br />notice, including observing and fine-tuning the signal timing. <br />CONSULTANT will drive the length of the project arterial during all designated corridor <br />synchronization timing plan hours of operation on a monthly basis in order to verify that <br />13 <br />