My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ORANGE COUNTY TRANSPORTATION AUTHORITY (6) - 2013
Clerk
>
Contracts / Agreements
>
O
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA)
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (6) - 2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2021 10:16:44 AM
Creation date
2/27/2013 10:46:36 AM
Metadata
Fields
Template:
Contracts
Company Name
ORANGE COUNTY TRANSPORTATION AUTHORITY
Contract #
A-2013-020
Agency
PUBLIC WORKS
Council Approval Date
1/22/2013
Expiration Date
12/31/2015
Destruction Year
2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COOPERATIVE AGREEMENT NO. C-2-1992 <br />ATTACHMENT A <br />Task 10: Traffic Signal Modeling Software Support <br />CONSULTANT, in addition to specific needs of AGENCIES as listed in the Attachments <br />to this Scope of Work, shall supply to OCTA or specified AGENCY, any upgrade or new <br />licenses for the following software and manuals: <br />1. Consultant shall provide a four day training session consisting of four (4) <br />modules. The modules will be on the functions and features of the following <br />programs: Module 1 — Highway Capacity Manual 2010 (HCM 2010) and its <br />relationships to the vendor software supplied on this project and other related <br />items. <br />a. Shall be the first module in the training session. <br />b. Oriented to transportation planning/operations and the interaction of <br />Synchro/Sim Traffic 8.0 <br />c. Four (4) hours in length <br />2. Module 2 — Synchro/Sim Traffic 8.0 <br />a. Module 2.1 — 3D Viewer 8 set up and operation (optional) <br />3. Module 3 — Tru Traffic 9.0 <br />4. Module 4 — Interaction between the programs and usage <br />The course content and times shall be coordinated with the APM and the Consultant. <br />The classes will be scheduled to take place in the OCTA IS Training Room. <br />The programs shall be taught over a 4 day period. The HCM session or module shall <br />be taught to OCTA personnel and Consultant invited personnel only. The HCM session <br />shall be taught the: first 4 hours of the instructional period, followed by Synchro/Sim <br />Traffic and Tru Traffic. <br />As part of the Tru Traffic Training, the Consultant shall provide a 'hands — on' exposure <br />to floating car studies in real time in a suitably equipped vehicle with laptop/gps on Main <br />Street in front of OCTA Headquarters. The length of the segment shall be from <br />Chapman Avenue to the CHOC Hospital Intersection near the SR — 22 Freeway. OCTA <br />shall provide the Synchro Network and Tru Traffic Network for that use. <br />The APM shall solely make the determination of the scheduling, content, and who will <br />instruct the training. The Consultant may perform the 'hands — on' exposure to floating <br />15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.