My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TUSTIN, CITY OF (MCFADDEN IMPROVEMENTS)-2013
Clerk
>
Contracts / Agreements
>
T
>
TUSTIN, CITY OF (MCFADDEN IMPROVEMENTS)-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2013 11:51:50 AM
Creation date
2/27/2013 3:53:44 PM
Metadata
Fields
Template:
Contracts
Company Name
TUSTIN, CITY OF
Contract #
A-2012-231
Agency
PUBLIC WORKS
Council Approval Date
11/19/2012
Destruction Year
0
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT for such purposes. SANTA ANA shall also have the right to enter <br />and inspect within TUSTIN boundaries at all times for the purposes of <br />overseeing TUSTIN lead agency functions. <br />7. TUSTIN shall have the exclusive right of approval of all plans, specifications <br />and cost estimates prepared by consultants for the portion of the PROJECT <br />within the jurisdictional boundaries of TUSTIN. <br />8. TUSTIN shall advertise and award the contract for the PROJECT in <br />accordance with federal, state and local laws. <br />9. TUSTIN shall cause all hired consultants on the PROJECT to obtain general <br />liability and motor vehicle liability insurance. For any consultant contract on <br />the PROJECT entered into after the date of "Agreement", TUSTIN shall also <br />cause SANTA ANA to be named as additionally insured, and include primary <br />and not-contributory language and standard separation of insureds <br />provisions, on insurance certificates and separate endorsements for all <br />consultant contracts related to the PROJECT. Copies of such certificates and <br />endorsements shall be provided to SANTA ANA prior to consultants <br />proceeding with work on the PROJECT. <br />10. TUSTIN shall, in advance, notify SANTA ANA as to the official advertising <br />dates, bid opening date, and construction start date, and request SANTA <br />ANA to attend all pertinent meetings (i.e., pre-construction, site, and final walk <br />through). <br />11. TUSTIN shall provide SANTA ANA final Record Drawings for the PROJECT <br />within 60 days of the completion and acceptance of construction. <br />SANTA ANA Rights and Duties: <br />SANTA ANA will provide review and comment on Project plans, specifications <br />and cost estimates during the design/contract bidding process and prior to <br />award of contract. <br />2. SANTA ANA shall have the exclusive right of approval of all plans, <br />specifications and cost estimates prepared by consultants for the portion of <br />the PROJECT within the jurisdictional boundaries of SANTA ANA. <br />3. SANTA ANA shall issue a no fee permit for work within SANTA ANA. <br />Contractor shall be required to obtain a SANTA ANA business license prior to <br />starting work. <br />4. Subject to Item 4 above, SANTA ANA shall pay its proportionate share of <br />design and construction costs, as estimated in Recital G and Exhibit "A" of <br />3
The URL can be used to link to this page
Your browser does not support the video tag.