My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25C - AGMT - ENVIRONMENTAL SERVICES 301 E JEANETTE
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
03/04/2013
>
25C - AGMT - ENVIRONMENTAL SERVICES 301 E JEANETTE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2013 12:24:53 PM
Creation date
2/28/2013 4:40:19 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
25C
Date
3/4/2013
Destruction Year
2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana <br />_ Updated Proposal for the 301 East Jeanette Lane <br />4auCUU011 Jr," Residential Project Mitigated Negative Declaration <br />11. SCOPE OF WORK <br />The following Scope of Work has been prepared pursuant to the information received from the City. The cost estimate, <br />which is Itemized according to task and issue, is included in Section IX of this proposal. <br />1.0 PROJECT KICK-OFF AND PROJECT CHARACTERISTICS <br />The work program will be initiated with a kick-off meeting with City representatives to discuss the project features in greater <br />detail. This initial meeting is vital to the success of the CEQA process and will be a key milestone in order to confirm the <br />parameters of the analysis, project construction program, buildout conditions, scheduling, and overall communications. <br />Prior to the kick-off, RBF will distribute a meeting agenda and detailed memorandum, which will identify information needs. <br />Based upon the detailed project information obtained at the project kick-off, RBF will draft a preliminary project description <br />(Task 3.2) for review and approval by City Staff. <br />2.0 RESEARCH AND INVESTIGATION <br />RBF will evaluate the necessary Information with respect to the 301 East Jeanette Lane Residential Project. Project <br />research will include coordination with the City to acquire relevant environmental data, technical studies, exhibits, maps, <br />and reference documents. The investigation will include a site visit to review existing land uses and environmental <br />conditions, as well as a photographic inventory of on-site and surrounding uses. <br />3.0 CEQA INITIAL STUDY/ASSESSMENT <br />RBF will prepare an Initial Study in accordance with the CEQA Guidelines. The Initial Study will include detailed <br />explanations of all checklist determinations and discussions of potential environmental impacts. The analysis shall be in <br />accordance with Public Resources Code Section 21080(c) and CEQA Guidelines Section 15070, This section will denote <br />the appropriate CEQA action based upon the Environmental Checklist/Environmental Analysis. The Initial Study reportwill <br />be presented as follows: <br />3.1 INTRODUCTION <br />The Introduction will cite the provisions of CEQA, the CEQA Guidelines, and the City of Santa Ana CEQA Implementation <br />procedures for which the proposed project is subject. This section will identify the purpose of the study and statutory <br />authority as well document scoping procedures, summary of the Initial Study/Mitigated Negative Declaration format, listing <br />of responsible and trustee agencies and documentation incorporated by reference. <br />3.2 PROJECT DESCRIPTION <br />The Project Description section will detail the project location, background, and history of the project, discretionary actions, <br />characteristics (addressed in Task 1.1), goals and objectives, construction program, phasing, agreements, and required <br />permits and approvals that are required based on available information. This section will include a summary of the project's <br />local environmental setting for the project, Exhibits depicting the regional and site vicinity will be included in this section. <br />3.3 INITIAL STUDY CHECKLIST <br />This section will include a summary page of project information followed by an explanation of factors considered for <br />potential impacts. The Initial Study Checklist will be presented in a four column layout, identifying: (1) potentially significant <br />impacts, (2) potentially significant impacts unless mitigated, (3) less than significant impacts, and (4) issues resulting in no <br />impacts. <br />JN 132203 e 2 e February 25, 2013 <br />25C-13
The URL can be used to link to this page
Your browser does not support the video tag.