My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
31A - CUP - CAR WASH AT 4426 W FIRST STREET
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
03/04/2013
>
31A - CUP - CAR WASH AT 4426 W FIRST STREET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2013 12:25:19 PM
Creation date
2/28/2013 4:40:21 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
31A
Date
3/4/2013
Destruction Year
2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Conditional Use Permit No. 2012-30 <br />February 11, 2013 <br />Page 3 <br />Land Use Element Policy 2.8 - Promote rehabilitation of commercial properties, and encourage <br />increased levels of capital investment. The project site was previously used as a print shop, an <br />above ground liquid propane station and a single-family residence with a detached garage which met <br />none of the City's development standards. The site's limited lot size constrains its development <br />opportunities and the relatively deteriorated nature of the surrounding properties also constrains the <br />property's marketability. The proposed project will make a substantial capital investment with the <br />construction of a high quality building and significant on and off-site improvements. <br />Urban Design Element Policy 1.5 - Enhanced architectural forms, textures, colors and materials are <br />expected in the design of all projects. The building design is unique and non-traditional. The car <br />wash tunnel has been completely enclosed and incorporated into the building. The use of large <br />anodized aluminum frames with glass storefront provides architectural and visual interest as well as <br />provides natural light to the interior of the car wash tunnel. The overall project design includes the <br />use of high quality material and design features such as Zinc composite panels, vertical metal siding <br />and aluminum reveals. The site also includes a generous amount of landscaping both along the First <br />and Newhope Street frontages and throughout the site. <br />The zoning for the site is C2 (General Commercial). The project meets all of the City's minimum <br />development standards for the C2 zoning district relating to site design, parking and landscaping. <br />Additionally, the design of the car wash demonstrated sensitivity to the surrounding area by using <br />forms and materials that contribute to the overall quality of the built environment. The proposed <br />project is consistent with the zoning designation. <br />Pro'ect Anal sls <br />The C2 (General Commercial) zoning designation allows automatic carwash subject to the approval of <br />a conditional use permit per Section 41-377.5(b) of the Santa Ana Municipal Code. The conditional <br />use permit requirement allows staff and decisional makers to review each project on an individual basis <br />to determine its compatibility with the surrounding area and apply appropriate conditions to ensure the <br />proposed business will not negatively affect the surrounding properties or community. <br />As part of the analysis process for conditional use permit, staff is required to analyze a variety of issues <br />to ensure a quality development and to provide justifications for findings needed to recommend <br />approval. These include the extent to which the proposed project provides a needed product or service <br />to the community; the project will not be detrimental to the health, safety or welfare of the community; <br />the project will not cause economic instability in the area; that the project complies with all of the <br />development standards contained in the City's Zoning Ordinance (SAMC Chapter 41); and that the <br />project is in conformance with the City's General Plan. Staff also identifies any potential impacts the <br />project may have to surrounding properties and develops appropriate conditions of approval or design <br />considerations to minimize or eliminates those issues. <br />31A-5
The URL can be used to link to this page
Your browser does not support the video tag.