Laserfiche WebLink
Page 37 of 41 <br />not meeting the SAPRF standards, and Contractor shall return any such non -satisfactory items at <br />his/her cost. <br />2.08 CONTRACTOR NEGLECT <br />Any damage to the City of Santa Ana, SAPRF, or private property, which has been determined <br />to be due to the Contractor's neglect, shall be corrected at no additional cost to the City of Santa <br />Ana or the SAPRF. <br />2.09 HOURS OF OPERATION <br />The Contractor shall perform all work between the hours of 7:00 a.m. and 4:00 p.m., Monday <br />through Friday. No work shall be performed on weekends or on City recognized holidays <br />without written SAPRF approval. <br />2.10 SPECIFICATIONS AND PLANS <br />The work performed shall be done in accordance with the Standard Specifications for Public <br />Works Construction, latest edition, hereinafter referred to as Standard Specifications. In case of <br />conflict between the Standard Specifications and this Specification, this Specification shall take <br />precedence over and be used in lieu of such conflicting portions. <br />SPECIFICATIONS AND PLANS — continued <br />Where the plans or specifications describe portions of work in general terms, but not complete <br />detail, it is understood that workmanship of the finest quality is to be used. Unless otherwise <br />specified, the Contractor shall furnish all labor, materials, tools, equipment and incidentals and <br />do all the work involved in executing the contract. <br />2.11 CONSTRUCTION EQUIPMENT <br />The Contractor shall take all necessary precautions for safe operation of his equipment and the <br />protection of the public from injury and damage from such equipment. <br />2.12 SOUND CONTROL REQUIREMENTS <br />The Contractor shall comply with all local sound control and noise level rules, regulations and <br />ordinances that apply to any work performed pursuant to the Contract. Each internal combustion <br />engine used for any purpose on the job or related to the job shall be equipped with a muffler of a <br />type recommended by the manufacturer of such equipment. No internal combustion engine shall <br />be operated on the project without said muffler. Full compensation for conforming to the <br />requirements of this section shall be considered as included in the prices paid for the various <br />contract items of work involved and no additional compensation will be allowed therefore. <br />Sounds, such as loud music, that are not related to the project, shall be kept at levels so as to not <br />disturb the general public. <br />2.13 TRAFFIC CONTROL <br />The Contractor shall notify the SAPRF representative of intent to begin the contract work at least <br />five (5) days before work is begun. The Contractor shall cooperate with local authorities relative <br />to handling traffic through the areas and shall make arrangements relative to keeping the working <br />area safe and clear of vehicles. <br />When entering or leaving roadways carrying public traffic, the Contractor's equipment, whether <br />empty or loaded, shall in all cases yield to public traffic.' All traffic delineation and -work' area <br />25H-51 <br />