My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2013-04-01
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
04/01/2013
>
FULL PACKET_2013-04-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2017 4:27:55 PM
Creation date
4/1/2013 9:52:19 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
City Council
Date
4/1/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
420
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REQUEST FOR <br />COUNCIL ACTION <br />CITY COUNCIL MEETING DATE: <br />APRIL 1, 2013 <br />TITLE: <br />CONTRACT AWARD FOR CITYWIDE <br />RESIDENTIAL STREET REPAIR PHASE 17 <br />(PROJECT NO. 137511) <br />i <br />CITY MANAGER <br />RECOMMENDED ACTION <br />CLERK OF COUNCIL USE ONLY: <br />APPROVED <br />? As Recommended <br />? As Amended <br />? Ordinance on 1" Reading <br />? Ordinance on 2"d Reading <br />? Implementing Resolution <br />? Set Public Hearing For_ <br />CONTINUED TO <br />FILE NUMBER <br />Award a contract to the lowest responsible bidder, United Paving Company, in accordance <br />with the Base Bid, totaling $704,724, for the construction of the Citywide Residential Street <br />Repair Phase 17. <br />2. Approve the Funding Analysis as shown in Exhibit 1 for a total estimated construction phase <br />cost of $879,500. <br />DISCUSSION <br />The City's Pavement Management System has identified the concrete residential streets shown in <br />Exhibit 2 as a high priority for rehabilitation. The pavement has deteriorated due to weather, age, <br />heavy usage, and poor drainage. Portions of the adjacent curb and gutter, driveway approaches, <br />curb ramps, and sidewalks are either missing or in disrepair and require replacement. <br />Improvements include reconstructing pavement and replacing damaged concrete curb and gutter, <br />driveway approaches, sidewalk, and constructing new cross gutters. Once completed, these <br />improvements will extend the life of the pavement and enhance the ride quality, surface drainage, <br />and appearance of the street. <br />This project is funded with Community Development Block Grant (CDBG) funds. To be eligible for <br />CDBG funding the majority of the project area must be within a low-moderate-income <br />neighborhood. City staff has reviewed the census tract information to confirm that this <br />recommended service area meets the requirements. <br />The Notice Inviting Bids was advertised on January 8 and 9, 2013, and bids were opened on <br />February 20, 2013. The following tables summarize the bid invitations mailed, the bids received, <br />and the bid results: <br />23A-1
The URL can be used to link to this page
Your browser does not support the video tag.