Laserfiche WebLink
Exhibit 2 <br />Description: <br />The existing PCC pavement is approximately 8" thick. Replacing the PCC with PCC Pavement or <br />AC Pavement is the most expensive repair. The most viable and economical rehabilitation is to <br />remove the 8" of PCC, import 4 -5" of Crushed Miscellaneous Base and Cement treat it with the <br />existing base and cap with 3" of AC. <br />W u, <br />to <br />Z <br />u w <br />m y <br />5TH Sl <br />Ll—sT--sJT L.-J L J L <br />WAL 'UT ST C <br />UHF2TNUT <br />F-___1 <br />d <br />c <br />M <br />f <br />u <br />`v <br />ST <br />u� <br />u. <br />" a <br />SANTA ANA <br />EcTr Eo:xu:i� OONTRACT AWARD TO HARDY AND HARPER Foil THE <br />aceNNfl CfPrM E RE81(7E"AL STREET REPAR PHASE 37. <br />� ��NrTE (PR CT W3- 7661) <br />uCF71L 1. 231A <br />IPA <br />4 <br />C? <br />EXHBfT 2 <br />