My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ATLAS-ALLIED, INC.
Clerk
>
Contracts / Agreements
>
PROJECTS
>
Completed Projects
>
ATLAS-ALLIED, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2024 2:55:07 PM
Creation date
4/15/2013 1:29:59 PM
Metadata
Fields
Template:
Contracts
Company Name
ATLAS-ALLIED, INC.
Contract #
12-6418
Agency
Public Works
Council Approval Date
4/1/2013
Expiration Date
8/15/2013
Destruction Year
2018
Notes
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE AMERICAN INSTITUTE OF ARCHITECTS <br />AIA Document A310 <br />Bid Bond <br />KNOW ALL MEN BY THESE PRESENTS, that we <br />ATLAS - ALLIED, INC. <br />1210 N. Las Brisas <br />Anaheim, CA 92806 <br />as Principal, hereinafter called the Principal, and <br />THE OHIO CASUALTY INSURANCE COMPANY <br />790 The City Drive South, Suite 200 <br />Orange, CA 92868 <br />a corporation duly organized under the laws of the State of NEW HAMPSHIRE <br />as Surety, hereinafter called the Surety, are held and firmly bound unto <br />CITY OF SANTA ANA <br />20 Civic Center Plaza <br />Santa Ana, CA 92701 <br />as Obligee, hereinafter called the Obligee, in the sum of <br />TEN PERCENT OF THE TOTAL AMOUNT OF THE BID Dollars ($10 %), <br />for the payment of which sum well and truly to be made, the said Principal and the said Surety, bind <br />ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by <br />these presents. <br />WHEREAS, the Principal has submitted a bid for <br />Project No. 12 -6418: Parton Street Sewer Main Improvements (REBID) <br />NOW, THEREFORE, if the Obligee shall accept the bid of the Principal and the Principal shall enter into a Contract with the Obligee in <br />accordance with the terms of such bid, and give such bond or bonds as may be specified in the bidding or Contract Documents with <br />good and sufficient surety for the faithful performance of such Contract and for the Prompt payment of labor and material furnished in <br />the prosecution thereof, or in the event of the failure of the Principal to enter such Contract and give such bond or bonds, if the <br />Principal shall pay to the Obligee the difference not to exceed the penalty hereof between the amount specified in said bid and such <br />larger amount for which the Obligee may in good faith contract with another party to perform the Work covered by said bid, then this <br />obligation shall be null and void, otherwise to remain in full force and effect. <br />ATLAS-ALLIED, INC. <br />stic.ti � <br />�uue <br />AIA DOCUMENT A310 • BID BOND • AIA • FEBRUARY 1970 ED • THE AMERICAN <br />INSTITUTE OF ARCHITECTS, 1735, N.Y. AVE., N.W., WASHINGTON, D.C. 20006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.