My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RBF CONSULTING 3 - 2013
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2021
>
RBF CONSULTING 3 - 2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2018 2:52:13 PM
Creation date
4/29/2013 1:12:24 PM
Metadata
Fields
Template:
Contracts
Company Name
RBF CONSULTING
Contract #
A-2013-014
Agency
PUBLIC WORKS
Council Approval Date
1/22/2013
Expiration Date
12/31/2014
Insurance Exp Date
8/30/2015
Destruction Year
2021
Notes
Amended by A-2013-014-01
Document Relationships
RBF CONSULTING 3A - 2015
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Key Personnel <br />Rebecca is a highly experienced Project Manager with a 17 -year career spent entirely in Orange County. She <br />works closely with local agencies and cities in the planning and design of their stormwater systems. She is <br />currently managing the San Diego Creek Master Plan of Drainage for the County of Orange and Storm Drain <br />Master Plon for the City of Anaheim. <br />Rebecca Kinney, PE I Project Manager <br />Rebecca Kinney, PE, will provide hands-on management in developing the Storm Drain Master Plan documents. <br />Rebecca is a Registered Civil Engineer with 17 years of experience in the master planning and design of stormwater <br />systems. She is well qualified to manage and coordinate this effort and has proven experience in delivering <br />complex projects on time and within budget. She is highly knowledgeable about Orange County storm drain <br />infrastructure and requirements, and has has completed multiple master plans of drainage in Orange County over <br />the last 10 years. Her recent experience has focused on development of Master Plans of Drainage, which focus on <br />storm drainage facility sizing, stormwater NPDES compliance, stream stability, and floodplain management. Her <br />planning experience includes large master planned communities as well as supporting hydrologic and stormwater <br />quality analysis as a basis for CEQA documentation. <br />Recent Experience: <br />• County of Orange — San Diego Creek Master Plan of Drainage <br />■ City of Anaheim - Storm Drain Master Plan <br />• Marblehead Coastal Runoff Management Plan, San Clemente <br />■ Southern California Logistics Airport - Storm Drain Master Plan, Victorville <br />• Peppertree Hills (formerly Tonner Hills) Runoff Management Plan, Brea <br />■ Storm Water Runoff Management Plan for Talega Valley, San Clemente <br />■ Heritage Fields Drainage and Water Quality Master Plans, Irvine <br />John is Vice President of Stormwater Management at RBF with 24 years of experience in the field of stormwater <br />management. For more than two decades, he has been responsible forthe successful delivery of storm drain <br />planning and design projects located throughout Orange County, including on-call services to the County of <br />Orange, Flood Control Division for the past 10 years. <br />John McCarthey, PE, CFM I Project Director <br />John McCarthy, PE, CFM, will have executive oversight of the team and project and will serve as an alternate <br />contact. As Project Director, he will help plan the work and assure sufficient resources are allocated to accomplish <br />the work within the City's established schedule. John is a Registered Civil Engineer in California and Nevada, <br />Certified Floodplain Manager, and served as a member of the California Department of Water Resources Alluvial <br />Fan Task Force. His experience is concentrated in the field of flood control and environmental engineering <br />focusing on hydrology/hydraulics, master planning, water quality, and flood control and storm drain system <br />design. John is highly knowledgeable about Orange County design requirements and has served as Project Director <br />/ Manager for numerous master planning and flood control projects that have included complex hydrology, <br />hydraulics, including coupled one- and two-dimensional storm water runoff models, as well as the civil design of <br />storm drain and channel improvement projects. <br />Recent Experience: <br />• County of Orange — San Diego Creek Master Plan of Drainage <br />■ Orange County Flood Control On -Call Contract <br />■ City of Anaheim - Storm Drain Master Plan <br />■ City of Buena Park — Storm Drain Master Plan <br />• Midway City Street and Storm Drain Master Plan and Improvements <br />
The URL can be used to link to this page
Your browser does not support the video tag.