My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WS - CAPITAL IMPROVEMENT PROGRAM (CIP) FY 13-14_HANDOUT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
05/20/2013
>
WS - CAPITAL IMPROVEMENT PROGRAM (CIP) FY 13-14_HANDOUT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2016 11:15:57 AM
Creation date
5/20/2013 1:34:58 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Date
5/20/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT TITLE: <br />Residential Street Repair Program <br />PROJECT CATEGORY: <br />NEIGHBORHOOD IMPROVEMENTS - <br />NEIGHBORHOOD STREET IMPROVEMENTS <br />111119-1\ 1 D]►gIJA I -11' <br />CITY OF SANTA ANA FY 1 3/1 4 CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />This project entails the rehabilitation of existing <br />roadway pavement for local streets. The project will <br />include the removal and replacement of existing <br />concrete streets. Various replacement pavement <br />strategies will be investigated to determine the most <br />cost effective and maintainable treatment. Minor <br />concrete repair to severely damaged or missing <br />curbs, gutters, sidewalks and wheelchair ramps will <br />also be included. Work in FY 13114 will focus on the <br />MidCity, Downtown and a portion of Santa Ana <br />Memorial Park Neighborhoods. <br />PROJECT COSTS <br />Engineering <br />Construction <br />TOTAL <br />SOURCE OF FUNDS <br />CDBG <br />FY 13/14 <br />FY 14/15 <br />50,000 <br />50,000 <br />738,692 <br />738,692 <br />788,692 <br />788,692 <br />FY 13/14 FY 14/15 <br />788,692 788,692 <br />TOTAL 788,692 788,692 <br />PROJECT NEED: <br />The local street network has 316 miles. In 2007, the <br />City embarked on an extensive citywide improvement <br />plan to rehabilitate the majority of the network. All <br />228 miles of asphalt residential streets and 2.5 miles <br />of residential concrete streets have been improved. <br />FY 15/16 <br />FY 16/17 <br />50,000 <br />50,000 <br />738,692 <br />738,692 <br />788,692 <br />788,692 <br />FY 15/16 <br />FY 16/17 <br />788,692 <br />788,692 <br />788,692 <br />788,692 <br />FY 17/19 <br />FY 13/19 <br />50,000 <br />50,000 <br />738,692 <br />738,692 <br />788,692 <br />788,692 <br />FY 17/19 <br />FY 19/19 <br />788,692 <br />788,692 <br />788,692 <br />788,692 <br />FY 19/20 <br />50,000 <br />738,692 <br />788,692 <br />FY 19/20 <br />788,692 <br />788,692 <br />AGENCY: DIVISION: CONTACT: DATE: <br />Public Works Agency Design Engineering Jason Gabriel, Principal Civil Engineer 01- May -13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.