My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WS - CAPITAL IMPROVEMENT PROGRAM (CIP) FY 13-14_HANDOUT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
05/20/2013
>
WS - CAPITAL IMPROVEMENT PROGRAM (CIP) FY 13-14_HANDOUT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2016 11:15:57 AM
Creation date
5/20/2013 1:34:58 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Date
5/20/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT TITLE: <br />Traffic Signal Equipment Replacement <br />PROJECT CATEGORY: <br />TRAFFIC IMPROVEMENTS - <br />TRAFFIC IMPROVEMENTS <br />LOCATION MAP <br />CITYWIDE <br />CITY OF SANTA ANA FY 1 3/1 4 CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />Replace outdated traffic signal and monitoring <br />equipment, such as cabinets, conflict monitors, <br />controllers, CCTV, and communication equipment, <br />both in the field and in the traffic management center <br />PROJECT COSTS <br />Construction <br />SOURCE OF FUNDS <br />Measure M2 Fairshare <br />FY 13/14 FY 14/15 <br />100,000 100,000 <br />TOTAL 100,000 100,000 <br />FY 13/14 FY 14/15 <br />100,000 100,000 <br />TOTAL 100,000 100,000 <br />PROJECT NEED: <br />Much of the traffic signal, pedestrian and monitoring <br />equipment in the City is old and no longer supported <br />by the manufacturers. This equipment needs to be <br />upgraded to maintain operations and to meet current <br />standards. <br />FY 15/16 <br />FY 16/17 <br />100,000 <br />100,000 <br />100,000 <br />100,000 <br />FY 15/16 <br />FY 16/17 <br />100,000 <br />100,000 <br />100,000 <br />100,000 <br />FY 17/16 FY 13/19 <br />100,000 100,000 <br />100,000 100,000 <br />FY 17/19 FY 19/19 <br />100,000 100,000 <br />100,000 100,000 <br />AGENCY: DIVISION: CONTACT: DATE: <br />Public Works Agency Transportation & Traffic Engineering Vinh Nguyen, Senior Civil Engineer 06- Mar -13 <br />-29- <br />FY 19/20 <br />100,000 <br />100,000 <br />FY 19/20 <br />100,000 <br />100,000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.