Laserfiche WebLink
PROJECT TITLE: <br />Walnut Pump Station <br />PROJECT CATEGORY: <br />INFRASTRUCTURE IMPROVEMENTS - <br />WATER <br />LOCATION MAP <br />LLLL11 L <br />W 9T <br />to <br />1ST STREET <br />w � � <br />a <br />J i � <br />YM Nl/i 51 <br />fi <br />i <br />PINE IT <br />Il <br />L. <br />CITY OF SANTA ANA FY 1 3/1 4 CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />This project will replace the existing Walnut Station <br />pump control building, upgrade the existing Motor <br />Control Center (MCC) and upgrade communications <br />capabilities at the facility. Site upgrades such as <br />replacement of the perimeter wall and landscape <br />improvements are included as part of this work. The <br />pump station improvements will result in a new <br />modern and more energy efficient pump station <br />facility. <br />PROJECT COSTS <br />Construction <br />FY 13/14 FY 14/15 <br />500,000 <br />TOTAL 500,000 <br />SOURCE OF FUNDS FY 13/14 FY 14/15 <br />Water Capital 500,000 <br />TOTAL 500,000 <br />PROJECT NEED: <br />This project is required to maintain effective operation <br />of the City's water system and to provide reliability to <br />the City water supply. <br />FY 15/16 FY 16/17 FY 17/15 FY 15/19 FY 19/20 <br />FY 15/16 FY 16/17 FY 17/15 FY 15/19 FY 19/20 <br />AGENCY: DIVISION: CONTACT: DATE: <br />Public Works Agency Water Resources Rudy Rosas, Senior Civil Engineer 01- Apr -13 <br />-31- <br />