My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WS - CAPITAL IMPROVEMENT PROGRAM (CIP) FY 13-14_HANDOUT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
05/20/2013
>
WS - CAPITAL IMPROVEMENT PROGRAM (CIP) FY 13-14_HANDOUT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2016 11:15:57 AM
Creation date
5/20/2013 1:34:58 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Date
5/20/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT TITLE: <br />Downtown Business /Civic Center Stormwater <br />Trash Reduction Project <br />PROJECT CATEGORY: <br />CITY FACILITY IMPROVEMENTS - <br />STORM DRAIN/WATER QUALITY <br />LOCATION MAP <br />�1 <br />o O_'�� i CAE <br />11 o lb (P �� IF91j <br />CD 4 0 ®8 <br />T 00 <br />O 0000 Off❑ C <br />O 0 0.CD ► <br />y a � <br />�soJ�'�= <br />ire <br />CITY OF SANTA ANA FY 1 3/1 4 CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />Installation of Automatic Retractable and Connector <br />Pipe Screens at catch basins with an ongoing <br />operations and maintenance program. <br />PROJECT COSTS <br />Engineering <br />Construction <br />SOURCE OF FUNDS <br />Fed. Clean Water <br />Measure M2 ECP <br />PROJECT NEED: <br />Trash Reduction Program to meet Federal Clean <br />Water Act water quality standards related to urban <br />runoff. <br />FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/15 FY 15/19 FY 19/20 <br />9,988 <br />99,876 <br />TOTAL 109,864 <br />FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/15 FY 15/19 FY 19/20 <br />9,988 <br />99,876 <br />TOTAL 109,864 <br />PY = Funds awarded in Multiple Prior Fiscal Years <br />AGENCY: DIVISION: CONTACT: DATE: <br />Public Works Agency Construction Engineering Carlos Castellanos, Assistant Engineer l/ 04- Apr -13 <br />-33- <br />
The URL can be used to link to this page
Your browser does not support the video tag.