My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WS - CAPITAL IMPROVEMENT PROGRAM (CIP) FY 13-14_HANDOUT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
05/20/2013
>
WS - CAPITAL IMPROVEMENT PROGRAM (CIP) FY 13-14_HANDOUT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2016 11:15:57 AM
Creation date
5/20/2013 1:34:58 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Date
5/20/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT TITLE: <br />Parking Structure Improvements <br />PROJECT CATEGORY: <br />CITY FACILITY IMPROVEMENTS - <br />CITY FACILITY IMPROVEMENTS <br />LOCATION MAP <br />CITYWIDE <br />CITY OF SANTA ANA FY 1 3/1 4 CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />Upgrade parking control and security system of <br />existing parking structures, including the installation of <br />gates, access controls, and ticket booths, roll -up <br />grilles and support and electrical upgrades needed to <br />support parking controls. Repairs will be performed <br />as needed to preserve the structural integrity of the <br />parking structures. <br />PROJECT NEED: <br />Based on the recent assessment report, the parking <br />structures in Downtown, which were constructed in <br />the late 1980s, are in need for structural repairs, ADA <br />compliance, and addition of new security systems <br />and installation of operational equipment. <br />PROJECT COSTS FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/15 FY 15/19 FY 19/20 <br />Engineering 80,000 <br />Construction 2,420,000 <br />TOTAL 2,500,000 <br />SOURCE OF FUNDS FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/15 FY 15/19 FY 19/20 <br />Parking Fees 2,500,000 <br />TOTAL 2,500,000 <br />PY = Funds awarded in Multiple Prior Fiscal Years <br />AGENCY: DIVISION: CONTACT: DATE: <br />Public Works Agency Design Engineering Jason Gabriel, Principal Civil Engineer 30- Apr -13 <br />-37- <br />
The URL can be used to link to this page
Your browser does not support the video tag.