Laserfiche WebLink
Water System <br />Reinstating the 2 Water System Operators and filling the remaining funded <br />vacancies will restore maintenance levels and initiate transition to proactive <br />maintenance. <br />Traffic Engineering <br />ReductionofEngineeringInternhourspartiallyoffsetbyreturnoffurlough <br />hoursbutwillresultinsomeprocessingdelays. <br />Design Engineering <br />Deletion of 2 engineering positions reduces in-house capacity to handle peak CIP <br />workloads in the future. <br />36 <br />