My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25E - AGMT - OPERATION CABRILLO TENNIS CENTER
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
06/03/2013
>
25E - AGMT - OPERATION CABRILLO TENNIS CENTER
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2013 10:58:47 AM
Creation date
5/30/2013 3:45:26 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Parks, Recreation, & Community Services
Item #
25E
Date
6/3/2013
Destruction Year
2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 YEAR BUDGET MAINTENANCE PLAN <br />The following includes a list of goals and time tables based on the Court Analysis <br />Survey. These timetables can be used in budgeting for short and long term <br />projects. <br />Subject Description Schedule <br />Laser Grading Laser grading should be considered every Every 10-15 <br />& i" lift 10-15 years. years <br />Top-Dress Topdressing is necessary for each annual Annually <br /> opening. 1-2 tons of Har-Tru per court <br /> should be applied with each top-dress. <br />Line Tape Line Tapes should be pulled up prior to top Annually <br />replacement dressing. This will ensure that lines are <br /> straight, tight and have no surface material <br /> buildup on either side of line tapes during <br /> the playing season. <br />Windscreens Windscreens should be replaced every 3-5 Now <br /> years or as they start to fade, discolor and & <br /> et brittle. 3-5 ears <br />Fencing-Hard Fencing should be painted or replaced as As Needed <br />Courts needed. Keeping this project in a cycle will <br /> help to eliminate a build up of high <br /> budgetary costs. <br />Tools & Keeping Brushes and Hand tools in good Drag <br />Equipment working condition is essential for great Har- Brushes, <br /> Tru courts. Replacing worn brushes, lute Line Masters <br /> blades etc. will keep the tools working Lutes <br /> properly. Aussie's <br />Roller Having a reliable roller on site will be Grease <br /> important to ensure the best possible annually & <br /> courts. Preventative maintenance will perform <br /> ensure reliable equipment. scheduled <br /> Preventative <br /> Maintenance <br />Amenities Nets, Net Posts, Coolers, Benches, etc. As Needed <br /> should be replaced as needed. <br />48 <br />25E-36
The URL can be used to link to this page
Your browser does not support the video tag.