My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25H - AGMT - SECURE BIKE PARKING
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
06/03/2013
>
25H - AGMT - SECURE BIKE PARKING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2013 11:01:50 AM
Creation date
5/30/2013 4:33:39 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25H
Date
6/3/2013
Destruction Year
2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Implementation Plan <br />Acire believes that a collaborative process with the City will maximize success of the project, ensure the <br />deliverables meet the needs of the project and produce actionable results from which to move forward. <br />Before Acire begins any development work, the team will meet with City Staff to discuss and review the <br />entire project, overall City objectives and confirm the schedule. This kickoff meeting will further refine <br />the project's objectives and develop updates and reporting schedules so the group can evaluate the <br />progress and development phases. From this meeting, Acire seeks to acquire a complete understanding <br />of the City's permit process, construction needs and related project requirements. <br />Site Review, Assessment and Documentation <br />Acire will meet with City staff at the proposed locations and conduct a thorough site review. The review <br />will include documenting the following: <br />• Digitally documenting the physical site location and surrounding area <br />• Assess solar collection for each site <br />• Determine footprint and concrete pad orientation <br />• Notate and catalogue utilities <br />• Review general safety elements <br />From the review, individual site plans will be created. The site plan will be utilized for the permitting <br />process. <br />Project Management <br />Acire has managed numerous projects for federal, state, regional, county and local governments. We <br />understand the need to provide solid reporting and use best industry practices to manage projects. <br />Because each client may have different agency requirements, Acire provides its clients with reporting <br />samples as part of the initial start-up process. This ensures the report process and format is provided in <br />an approved method. We use standard Microsoft software products such as MS Project, MS Word and <br />MS Excel for reporting. <br />Monthly progress reports will include a narrative of work performed, status on milestones, copies of <br />work product, individual signed time sheets for each staff member, invoice separated per task and a <br />updated project budget and scope of work (if necessary). The narrative report will summarize the work <br />performed, detail work performed per task, define any challenges or obstacles with corrective measures <br />as necessary, and identify those tasks to perform for the upcoming month. The report will be submitted <br />on our before the loth of every month until project completion. <br />aci re, Inc <br />25H-34
The URL can be used to link to this page
Your browser does not support the video tag.