My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25H - AGMT - SECURE BIKE PARKING
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
06/03/2013
>
25H - AGMT - SECURE BIKE PARKING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2013 11:01:50 AM
Creation date
5/30/2013 4:33:39 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25H
Date
6/3/2013
Destruction Year
2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cost Proposal <br />Below is Acire's cost proposal. <br />ITEM DESCRIPTION <br /> <br />EQUIPMENT UNIT <br /> <br />PRICE QUANTITY EXTENDED <br />PRICE <br />1 Model: BC-202 -12 bike secure parking system. <br />Includes glass panels, access control system, security <br />camera, wireless communications, one security door <br />and solar system. $25,500 2 $51,000 <br />2 Model: BC-300 - 24 bike secure parking system. <br />Includes glass panels, access control system, security <br />camera, two security doors, wireless communications <br />and solar system. $44,500 1 $44,500 <br />3 Partition wall for BC-300 $2,200 1 $2,200 <br />4 Model: BC-D102 - Public Bike Maintenance Stand $1,300 3 $3,900 <br /> TOTAL EQUIPMENT $101,600 <br /> Tax $9,144 <br /> SERVICES <br />1 Stamped/Certified Engineering Documentation $1,200 3 $3,600 <br />2 Site preparation and permitting $8,000 1 $8,000 <br />3 Structure installation - BC202 $1,800 2 $3,600 <br />4 Structure installation - BC300 $3,600 1 $3,600 <br />5 Construction - Concrete pad prep forming and <br />installation $6,446 3 $19,338 <br />6 Shipping of structures $800 3 $2,400 <br />7 Installation of bike stand $300 3 $900 <br />8 Project Management $100 60 Hours $6,000 <br /> TOTAL SERVICES $47,438 <br /> <br />SUPPORT SYSTEM One time <br />Cost <br />1 BikeConnect Reservation and Management Platform - <br />Version 2.1 $10,740 1 $10,740 <br /> ANNUAL MAINTENANCE AND SUPPORT SERVICES <br />1 Custodial, cleaning and maintenance services $12,500 Annual $12,500 <br />2 Web support $9,600 Annual $9,600 <br />3 800 Customer Support $9,600 Annual $9,600 <br />Note: the construction and site preparation quotation assumes each site is free from utility, water or sewer <br />relocation and DOES NOT include any demolition work. Costs will increase if any of the proposed locations requires <br />work not quoted. <br />aci rc' i roc <br />25H-36
The URL can be used to link to this page
Your browser does not support the video tag.