My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2013-06-03
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
06/03/2013
>
FULL PACKET_2013-06-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2017 4:24:47 PM
Creation date
6/3/2013 9:53:36 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
6/3/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
868
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 YEAR BUDGET MAINTENANCE PLAN <br />The following includes a list of goals and time tables based on the Court Analysis <br />Survey. These timetables can be used in budgeting for short and long term <br />projects. <br />Subject <br />Description <br />Schedule <br />Laser Grading <br />Laser grading should be considered every <br />Every 10 -15 <br />& i" lift <br />10 -15 years. <br />years <br />Top -Dress <br />Topdressing is necessary for each annual <br />Annually <br />opening. 1 -2 tons of Har -Tru per court <br />should be applied with each top- dress. <br />Line Tape <br />Line Tapes should be pulled up prior to top <br />Annually <br />replacement <br />dressing. This will ensure that lines are <br />straight, tight and have no surface material <br />buildup on either side of line tapes during <br />the playing season. <br />Windscreens <br />Windscreens should be replaced every 3 -5 <br />Now <br />years or as they start to fade, discolor and <br />& <br />et brittle. <br />3 -5 years <br />Fencing -Hard <br />Fencing should be painted or replaced as <br />As Needed <br />Courts <br />needed. Keeping this project in a cycle will <br />help to eliminate a build up of high <br />budgetary costs. <br />Tools & <br />Keeping Brushes and Hand tools in good <br />Drag <br />Equipment <br />working condition is essential for great Har- <br />Brushes, <br />Tru courts. Replacing worn brushes, lute <br />Line Masters <br />blades etc. will keep the tools working <br />Lutes <br />properly. <br />Aussie's <br />Roller <br />Having a reliable roller on site will be <br />Grease <br />important to ensure the best possible <br />annually & <br />courts. Preventative maintenance will <br />perform <br />ensure reliable equipment. <br />scheduled <br />Preventative <br />Maintenance <br />Amenities <br />Nets, Net Posts, Coolers, Benches, etc. <br />As Needed <br />should be replaced as needed. <br />.• <br />25E -36 <br />
The URL can be used to link to this page
Your browser does not support the video tag.