My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2013-06-03
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
06/03/2013
>
FULL PACKET_2013-06-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2017 4:24:47 PM
Creation date
6/3/2013 9:53:36 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
6/3/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
868
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Acire — BikeConnect Team <br />Mr. Derek Fretheim will serve as principal -in- charge and project manager for this project. Below is the <br />organizational chart for Acire's Team. <br />Derek Fretheim <br />Principal -in- charge; <br />Project Manager <br />Veronica Williams Kerry Berlin <br />Technology Lead Tolar, Project Manager <br />Construction Services <br />To be bid <br />a h2, i h e <br />Tolar Manufacturing <br />Patrick Merrick <br />VP; Principal -in- charge <br />25H -23 <br />Eli Meza <br />Engineering, Lead <br />Engineering Review <br />Tolar <br />Gabriel Guzman <br />Production, Lead <br />Installation Services <br />Tolar <br />
The URL can be used to link to this page
Your browser does not support the video tag.