Laserfiche WebLink
RESOLUTION 2013-XXX <br />REVENUEFY 12-13FY 13-14 <br />ACCOUNTDEPARTMENT/MISCELLANEOUS FEE OR SERVICEUNITFEESFEES <br />SECTION IXPLANNING & BUILDING AGENCY <br />Projects prior to May 18, 2009, shall be subject to the fees indicated in Resolution 2009-018 <br />5160314) Temporary services: <br /> At the time of application for temporary power, the owner <br /> shall post a $1,000.00 cash or cashier's check conforming to the <br /> Santa Ana Municipal Code Section 8-1768 for each service <br /> meter. This deposit shall be released upon request after the <br /> Certificate of Completion or Certificate of Occupancy is issued. <br />$210.54 <br /> Temporary Electrical Service, Prior to Approval <br />Each Meter$205.00 <br /> Or Occupancy (30 Days) <br />$29.32 <br /> Temporary work with service, each meterEach Meter$28.55 <br />5160315) Lighting standards: <br />$11.01 <br /> With one (1) fixture eachEach$10.72 <br />$3.18 <br /> Each additional fixture on the same standardEach$3.10 <br />$8.66 <br />5160316) Time clock or photo electric cell, eachEach$8.43 <br />$11.01 <br />5160317) Radiant ceiling heat per roomPer Room$10.72 <br />5160318) Power apparatus: generators, motors, transformers, <br /> rectifiers, synchronous converters, capacitors, <br /> industrial heating, cooking or baking equipment, and <br /> other apparatus as follows: <br /> (Ratings - horsepower (HP), kilowatts (KW), and <br /> Kilovolt amps (KVA)) <br />$4.49 <br /> Up to and including 1 HP, KW, KVA eachEach$4.37 <br />$11.58 <br /> Over 1 and not over 10 HP, KW, KVA eachEach$11.28 <br />$23.48 <br /> Over 10 and not over 50 HP, KW, KVA eachEach$22.86 <br />$50.29 <br /> Over 50 and not over 100 HP, KW, KVA eachEach$48.97 <br />$66.99 <br /> Over 100 and not over 500 HP, KW, KVA eachEach$65.23 <br />$83.47 <br /> Over 500 HP, KW, KVA eachEach$81.28 <br />$32.50 <br />5160319) Demolition, per projectPer Project$31.65 <br />56 <br />