My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20130528_2013-06_806ESantaAnaBlvd
Clerk
>
Resolutions
>
PLANNING COMMISION
>
2013
>
20130528_2013-06_806ESantaAnaBlvd
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2013 3:11:33 PM
Creation date
6/11/2013 3:11:33 PM
Metadata
Fields
Template:
PBA
Doc Type
Resolution
Doc #
TTM2013-01
Item #
1
Date
5/28/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• MAY 28, 2013 <br />PAGE 2 OF 2 <br />8. Prior to installation of windows, applicant shall prepare a sample window <br />showing proposed window detail. Window Installation shall be reviewed and <br />approved by staff. <br />9. Provide details of the mailbox or "gang box" to be installed. Such box shall <br />be enclosed in a decorative pedestal to match architecturally with the <br />proposed buildings. <br />10. Paving at driveway entrance and garage aprons shall match the proposed <br />walkway paving of colored concrete, medium acid washed finish. <br />11. All utility meters and boxes shall be placed in vaults below grade. Any <br />above grade meter and/or box shall be reviewed by the Planning Division <br />Manager to ensure all options have been reviewed. <br />12. Common area improvements shall be installed, inspected, and approved <br />prior to the utility release of the first unit. <br />r. <br />~. <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.