My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25E - AGMT - MEDIAN LANDSCAPE SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
06/17/2013
>
25E - AGMT - MEDIAN LANDSCAPE SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2013 5:47:10 PM
Creation date
6/13/2013 2:55:47 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25E
Date
6/17/2013
Destruction Year
2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7:00 a.m. No watering shall occur during the daytime <br />unless associated with irrigation check/repairs or with <br />prior approval by the Projects Manager or designee. <br />h. Contractor shall provide irrigation personnel fully <br />trained in all phases of landscape irrigation systems <br />operation, maintenance, adjustment, and repair. This <br />is to include diagnosis and repair of controllers, valve <br />wires, control valves, lateral lines, gate valves, main <br />lines, strainers, pressure regulators, backflow devices, <br />moisture sensors, master valves, and electric <br />pedestals. Contractor shall maintain an adequate <br />stock of medium and high usage items for repair of all <br />irrigation systems. <br />Note: Contractor has the responsibility to adequately <br />diagnose problems and take corrective action as called <br />for in the contract specifications. Should the City be <br />called upon to diagnose an irrigation problem that is <br />Contractors responsibility, the City's labor and material <br />cost incurred will be deducted from the monthly <br />payment to Contractor. <br />Automatic controllers and/or enclosures shall be locked <br />while unattended. <br />All controller enclosures must be painted in approved <br />colors, as needed, to prevent rusting and maintain <br />good appearance. System Maintenance: Once a year <br />during the month of March, Contractor shall wipe down <br />the equipment in the irrigation controller cabinet to <br />remove all dust and dirt, clean all electrical <br />connections, install bait traps for control of ants, <br />replace batteries as required, clean and remove <br />intruding soil in valve boxes and replace gravel, as <br />originally specified. <br />All hinges and locks shall be regularly oiled to ensure <br />trouble free operation. <br />m. Sprinkler heads shall be kept clear of overgrowth that <br />may obstruct maximum operation. <br />n. Repairs made to the irrigation system must be made in <br />accordance with the system's original design with <br />products equal to or higher quality than currently <br />provided. Workmanship shall be performed in <br />accordance with industry standards. <br />o. Contractor shall be responsible for regular monitoring <br />of all systems and correcting for: coverage, <br />25E-39
The URL can be used to link to this page
Your browser does not support the video tag.