My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25E - AGMT - MEDIAN LANDSCAPE SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
06/17/2013
>
25E - AGMT - MEDIAN LANDSCAPE SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2013 5:47:10 PM
Creation date
6/13/2013 2:55:47 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25E
Date
6/17/2013
Destruction Year
2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
working days and shall be repaired using only pre-approved <br />materials. <br />4. Contractor shall be responsible for repair-related maintenance <br />such as, but not limited to, watering and fertilizing of replaced <br />plant materials until accepted by the Projects Manager or <br />designee. <br />7) Vandalism <br />Contractor shall be responsible for the labor to repair damaged <br />landscaping caused by vandalism or vehicle accidents with <br />material costs to be reimbursed by City. The Contractor shall <br />submit invoicing to establish cost of materials. <br />J. ANNUALS <br />1) Areas designated for annuals planting shall be rotated on a <br />triannual (three times a year) basis. <br />2) Appearance of designated areas shall be kept fresh and vigorous <br />at all times. <br />K. PENALTIES AND FINES <br />Failure to comply with specifications of contract or requests from the <br />Projects Manager or designee and/or creating unnecessary delays, as <br />determined by the Projects Manager or designee, may be cause for fines <br />and penalties in the amount of $300.00 per occurrence per day until said <br />request(s) is completed. This shall be deducted from routine monthly <br />maintenance payments. <br />Failure by Contractor to provide certain maintenance <br />functions/deliverables within the timelines called for in this specification <br />not limited to (and itemized below) will result in a penalty of $300.00 <br />(called out for in contract) for each occurrence being withheld from <br />Contractor's current monthly invoice payment. <br />1. To take immediate corrective action to landscape that is <br />stressed due to lack of water, insect and weed infestation <br />2. To provide schedules <br />3. To utilize City-supplied water meter <br />4. To perform as indicated on the work schedule <br />5. To respond to emergencies within thirty (30) minutes <br />6. To correct unsafe conditions within twenty-four (24) hours <br />25E-45
The URL can be used to link to this page
Your browser does not support the video tag.