My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25G - AGMT - MANAGEMENT CABRILLO TENNIS CENTER
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
06/17/2013
>
25G - AGMT - MANAGEMENT CABRILLO TENNIS CENTER
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2013 5:48:47 PM
Creation date
6/13/2013 4:00:37 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Parks, Recreation, & Community Services
Item #
25G
Date
6/17/2013
Destruction Year
2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FALL SURFACE RECONDITIONING <br />- Fa11-sur f ace reconditioning is increasing in popuIa-rty because the tennis courts <br />can be opened earlier in the spring when demand for play is strong and time <br />available for reconditioning is short, particularly during a wet spring. The <br />maintenance staff is under less time constraint in the fall, allowing for better <br />quality control in providing a superior playing surface. More time is available <br />for other important (and often postponed) spring maintenance duties around <br />the tennis court. Fall weather patterns are more stable & predictable for <br />reconditioning. Initial expense to purchase a tennis court cover is justified <br />considering the life of the cover, benefits to the players and increased <br />productivity of the maintenance staff. <br />WINTERIZING THE IRRIGATION SYSTEM <br />1. Turn off main water supply. <br />2. Ensure manual valves at base of sprinkler heads are open. <br />3. With an air compressor, blow out the irrigation lines by activating each zone <br />separately for approximately 5 minutes, do not exceed 60 psi. Open each zone <br />valve box cover and inspect valves for any needed repairs while the system is <br />being blown out. <br />4. Repeat step 3 until all water has been blown through the system. <br />5 Remove any debris from inside the valve boxes. <br />6. Replace valve box lids. <br />7. Note any repairs or improvements needed for the system before the next <br />season <br />CONTINUING EDUCATION <br />Several educational aids are available for staff training; the General <br />Maintenance Outline for Har-Tru Tennis Courts, the Maintenance Video, th.e <br />maintenance DVD and other resources. Visit our web-site at www.har-trU&QM <br />for additional information. These products are ideal for keeping your staff <br />informed, on a regular basis about the most efficient methods of Har-Tru tennis <br />court maintenance. <br />46 <br />25G-33
The URL can be used to link to this page
Your browser does not support the video tag.