My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2013-06-17
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
06/17/2013
>
FULL PACKET_2013-06-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2017 4:24:04 PM
Creation date
6/17/2013 1:06:19 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
6/17/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
580
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I. PURPOSE <br />The purpose of this Request for Proposal (RFP) is to obtain a prime contractor to enter <br />into an agreement with the City to perform an assessment of the current street lighting <br />system at various locations as designated by the City where high voltage street lighting <br />systems operate, and begin a three phase process for the removal and replacement of <br />existing conduit, rewiring of each street light pole, the installation of new service points <br />and the installation of new globes. <br />II. REQUEST FOR PROPOSAL TERMS <br />1. PROPOSAL SUBMISSIONS <br />Proposals must be submitted to the Administrative Services Division in a sealed envelope <br />showing on the outside, the name of the bidder, and the proposal due date and time. An <br />authorized representative of the contractor must sign the proposal. <br />2. PROPOSAL WITHDRAWAL <br />Proposals may be withdrawn by written request received before the hour set for the <br />opening. After that time, the contractor may not withdraw proposals for a period of ninety <br />(90) days from the date of the opening. <br />3. LATE PROPOSALS <br />It is the responsibility of the contractor to see that any proposal submitted shall have <br />sufficient time to be received by the Administrative Services Division prior to the <br />proposal due date and time. The City of Santa Ana Public Works Agency shall not be <br />responsible for proposals lost or delayed in the mail. Late proposals will be returned to <br />the contractor unopened. <br />4. REQUIRED DOCUMENTS <br />Contractor must return the following completed documents with their proposal: <br />• Detailed proposal of services in accordance with the specifications detailed in <br />Exhibit A. Proposal should take into consideration the evaluation criteria included in <br />Section II and should not exceed 20 pages. <br />• Proposals should include job qualifications of key contract staff including lead <br />service personnel, superintendents, supervisors and managers. Personnel shall have <br />at least one year of experience maintaining and troubleshooting street lighting <br />systems. <br />• Completed Contractor's References form (Section III); <br />• Signed Proposal Form (Section IV); <br />• Signed Certification of Non - Discrimination by Contractors (Section V); <br />• Completed Contract Pricing Sheets (Section VI); <br />• Exhibit C is for reference only, but will be required when the contract is awarded to <br />the successful contractor. <br />3 <br />19C -5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.