My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
T & B PLANNING 5 - 2013
Clerk
>
Contracts / Agreements
>
T
>
T & B PLANNING 5 - 2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2015 9:50:25 AM
Creation date
6/17/2013 4:03:19 PM
Metadata
Fields
Template:
Contracts
Company Name
T & B PLANNING
Contract #
N-2013-068
Agency
PUBLIC WORKS
Expiration Date
6/30/2014
Insurance Exp Date
2/1/2015
Destruction Year
2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.1^ <br />CECA Consulting Services — Walnut Pump Station Building' J <br />EXHIBIT A: SCOPE OF WORK w w w c <br />distribution list. T &B Planning will review the list and suggest appropriate modifications, if any. Further, we <br />assume that the City will conduct the mailing of the N01, NOC, and IS /MND. The budget allocated to this task <br />also assumes that the City will conduct any advertisement in local newspapers and /or on- and off -site posting of <br />the NOI. If T &B Planning is requested to conduct the mailing, newspaper advertisements, and /or on- or off -site <br />posting, additional budget will be required. <br />TASK 7: CONSIDERATION OF PUBLIC COMMENT <br />Upon completion of the public review period, T &B Planning will review all comment letters, and evaluate the <br />IS /MND for CEQA adequacy in consideration of the submitted comments. In response to letters of comment, <br />revisions may be necessary to the IS /MND which will be discussed with the City and authorized prior to changes <br />being made to the document. For purposes of this proposal, our budget assumes that only minor changes <br />would be necessary to the document in response to public comment. <br />TASK 8: MEETINGS AND COORDINATION <br />T &B Planning will attend up to three (3) in- person meetings. For purposes of estimating cost, we have assumed <br />that the meetings will have a duration of two (2) hours each. Time attending and traveling to /from in- person <br />meetings will be billed on a Time and Materials basis against the not -to- exceed budget for this task. If less time <br />is required, we will only bill for the time actually spent. <br />Additionally, this task is intended to cover all coordination efforts associated with T &B Planning's work. This <br />includes preparing /updating project schedules and all external coordination including but not limited to <br />communication via phone, e-mail, letter, memo, and /or web -based conferencing with City staff, public agencies, <br />legal counsel, and any technical report preparers (as needed). This task will commence upon authorization of <br />our contract and will continue throughout the duration of the project. <br />All coordination work performed by T &B Planning will be within our proposed not -to- exceed budget and billed <br />on a Time and Materials basis. Because the number of meetings and some of the coordination work will be <br />reactive to City staff requests, the actual number of hours associated with this task may be higher or lower than <br />the estimated budget. If less time is required, we will only bill for the time actually spent. If the budget amount <br />becomes drawn down to less than 5 remaining hours, T &B Planning will notify the City to determine how <br />remaining coordination work can be completed in 5 hours or less. <br />TASK 9: ATTEND PUBLIC HEARING <br />A T &B Planning Senior Project Manager (Jeramey Harding) will attend up to one (1) public hearings before the <br />City of Santa Ana decision - making body. Time preparing for, attending, and traveling to /from the public hearing <br />will be billed on a Time and Materials basis against the not -to- exceed budget for this task. If less time is <br />required, we will only bill for the time actually spent. If preparation time required exceeds three (3) hours or if <br />the public hearing is longer than four (4) hours, the additional time will be billed against Task 8. This proposal <br />assumes that any presentation materials needed in support of the public hearings will be prepared by the City. <br />Walnut Pump Station April 26, 2013 <br />T &B Planning, Inc. <br />Page 4 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.