My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
T & B PLANNING 5 - 2013
Clerk
>
Contracts / Agreements
>
T
>
T & B PLANNING 5 - 2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2015 9:50:25 AM
Creation date
6/17/2013 4:03:19 PM
Metadata
Fields
Template:
Contracts
Company Name
T & B PLANNING
Contract #
N-2013-068
Agency
PUBLIC WORKS
Expiration Date
6/30/2014
Insurance Exp Date
2/1/2015
Destruction Year
2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CEQA Consulting Services — Walnut Pump Station Building <br />EXHIBIT A: SCOPE OF WORK <br />l� �J <br />riawrvirvc <br />Provided below is T &B Planning's recommended work program for preparing a MIND in support of the Walnut <br />Pump Station Building Upgrade (hereafter, "the proposed project "). Please note that the Scope of Work <br />described below will likely not be undertaken chronologically as presented, as there may be considerable <br />overlap on the timing of each task. Additionally, all meetings and coordination is included under Task 8, although <br />these efforts will occur throughout the entire scope of work. <br />It should be noted that the following scope of work does not include the preparation of any technical studies. <br />However, it is recommended that the City of Santa Ana consider commissioning a construction -level Air Quality <br />Impact Analysis to support the MND's conclusion that near -term air quality impacts would be less than <br />significant, or reduced to less than significant levels with the incorporation of mitigation measures. Additionally, <br />in the event that project construction would result in any noise - producing activities during nighttime hours (e.g., <br />operation of generators or pumps), then a construction -level noise impact analysis also should be commissioned <br />by the City. This proposal also assumes that the project's engineer will prepare a hydrology study and water <br />quality management plan (WQMP), both of which will be needed in support of the MND's analysis of impacts to <br />hydrology and water quality. <br />TASK 1: RESEARCH, DATA ACQUISITION, AND REVIEW <br />During this task, we will collect and review all applicable information about the proposed project and subject <br />property that is on file at the City of Santa Ana Public Works Agency. We also will consult our in -house GIS <br />database to identify information relevant to the CEQA analysis. Lastly, if GPS- referenced photographs of the <br />property are not supplied to us by the City, our staff will conduct a cursory field visit to document existing site <br />conditions, surrounding development, and other aspects of the site's physical and environmental setting that <br />will need to be described in the CEQA document. The photos will be GPS- referenced and used as the baseline for <br />the CEQA document and the aesthetics evaluation required by CEQA. <br />TASK 2: PREPARE SCREENCHECK DRAFT INITIAL STUDY <br />T &B Planning will prepare a Screencheck Draft Initial Study (IS) using the City of Santa Ana's Initial <br />Study /Environmental Checklist Form (herein, "Initial Study "), based on CEQA Appendix G. The Screencheck Draft <br />Initial Study will include: a brief description of the proposed project and associated approvals (if any); a <br />description of the project's location; an overview of existing site and surrounding conditions /environmental <br />setting; an examination of whether the proposed project would be consistent with existing zoning, plans, and <br />other applicable land use controls; a list of references used in the preparation of the Initial Study; and the names <br />and qualifications of the persons who participated in preparing the Initial Study. The Initial Study also will <br />identify the required CEQA document (which, for purposes of this proposal, is assumed to be a MIND). <br />The Initial Study's Environmental Checklist and Responses to Environmental Checklist will be thoroughly <br />completed as part of this task. Each response will be detailed and every conclusion will be supported by <br />substantial factual evidence. The Responses to Environmental Checklist section will contain pertinent analysis <br />ut Pump Station April 26, 2013 <br />T &B Planning, Inc. <br />Page 1 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.