Laserfiche WebLink
TETRATHCH 17883von Knrmaa,saila Methne, C 92814 <br />TO 9400094000 <br />Fax; 949.009.5910 <br />Client City of Santa Ana Shoet No. I of I <br />Project Westminster Ave Sewer Main Improvements Job No. 134- P00599- 0086.04 <br />Cost Sharing Cost Estimate Computed by: MID <br />Checked by MW& Date: 2 /42013 <br />A.nampotees. 1. Percentage of cost assigned to Santa Ana and Qarden Grove equ9ls the percentage of flow each City contributes between <br />each manhole. See ruched spreadshccrfor percar tn6as. <br />2. Peromeago of lump sum items in each reach is calculated as the porecntago ofpipoline connected in each reach divided <br />by the total amount ofpip l no. See Table A below. <br />1, J}W59NABGV'nyioaenngtl 10.lanmmwlCbn CnlmloCOn st ad.r <br />