My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
VASILJ, INC.
Clerk
>
Contracts / Agreements
>
PROJECTS
>
Completed Projects
>
VASILJ, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2024 3:14:09 PM
Creation date
7/2/2013 7:27:51 AM
Metadata
Fields
Template:
Contracts
Company Name
VASILJ, INC.
Contract #
12-6605
Agency
Public Works
Council Approval Date
6/17/2013
Notes
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cl i'Y OF SANTA ANA <br />PUBLIC WORKS AGENCY <br />CONTRACT CHANGE ORDER <br />Project Number 12 -6605: Westminster Ave. Sewer Main Improvements Change Order Number 1 <br />To Vaslli.Inc. Contractor <br />You are hereby directed to make the herein changes from the plans and specifications or do the following described work not included in the plans and <br />specifications on this contract. <br />NOTE: THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCIL OR CITY MANAGER. <br />Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. <br />Change requested by PUBLIC WORKS AGENCY <br />EXTRA WORK AT TIME & MATERIALS <br />►J <br />1. Provide 2 two -sided information signs. (PCO #01) <br />2. Remove steel and concrete casings from existing pipe. (PCO #02) <br />3. Loss of productivity due to leaking City water service (PCO #03) <br />FINAL COST $2,138.51 <br />FINAL COST $7,551.60 <br />FINAL COST $2,123.65 <br />4. Grind and pave additional area per field direction given on 4/16/2014 (PCO #04) <br />Page 1 of 2 <br />FINAL COST $29,070.24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.