Laserfiche WebLink
P, <br />Agreement D12-030 <br />• Site configurations for overall site based on the site constraints and proposed <br />diversion structures <br />Deliverables <br />• Develop two conceptual layouts for each candidate diversion location <br />• Incorporate Conceptual Site Layout into Conceptual Design Report <br />6. Preliminary Assessment of Costs <br />A preliminary assessment of costs will be provided for each alternative. These costs will <br />be limited to initial implementation and need not include life cycle costs. <br />Deliverables <br />• Incorporate Preliminary Assessment of Costs into Conceptual Design Report <br />7. Regulatory Compliance Assessment <br />The selenium loading reduction and receiving water benefits, if applicable, from <br />diversions will be assessed relative to the draft Best Management Practices Strategic Plan <br />and existing and proposed selenium TMDLs. <br />Meetings will be held with watershed funding partners and OCSD to present information <br />and receive feedback. <br />Deliverables <br />• Incorporate Regulatory Compliance Assessment into Conceptual Design Report <br />8. Conceptual Design Report <br />A Conceptual Design Report outlining the aforementioned design parameter, costs and <br />regulatory compliance assessment will be prepared. A draft Table of Contents follows: <br />• Introduction <br />• Project Descriptions <br />• Conceptual Site Layouts <br />• Estimated Costs of Construction <br />• Environmental and Regulatory Issues <br />• Recommendations for Next Steps <br />• Summary <br />Deliverables <br />• Draft Conceptual Design Report for review <br />• Final Conceptual Design Report <br />• Final electronic version of Conceptual Design Report in pdf format <br />20D-9