My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20D - AA - REIMBURSEMENT FOR NEWPORT BAY
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
07/15/2013
>
20D - AA - REIMBURSEMENT FOR NEWPORT BAY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2013 1:42:32 PM
Creation date
7/11/2013 10:29:49 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
20D
Date
7/15/2013
Destruction Year
2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
P, <br />Agreement D12-030 <br />• Site configurations for overall site based on the site constraints and proposed <br />diversion structures <br />Deliverables <br />• Develop two conceptual layouts for each candidate diversion location <br />• Incorporate Conceptual Site Layout into Conceptual Design Report <br />6. Preliminary Assessment of Costs <br />A preliminary assessment of costs will be provided for each alternative. These costs will <br />be limited to initial implementation and need not include life cycle costs. <br />Deliverables <br />• Incorporate Preliminary Assessment of Costs into Conceptual Design Report <br />7. Regulatory Compliance Assessment <br />The selenium loading reduction and receiving water benefits, if applicable, from <br />diversions will be assessed relative to the draft Best Management Practices Strategic Plan <br />and existing and proposed selenium TMDLs. <br />Meetings will be held with watershed funding partners and OCSD to present information <br />and receive feedback. <br />Deliverables <br />• Incorporate Regulatory Compliance Assessment into Conceptual Design Report <br />8. Conceptual Design Report <br />A Conceptual Design Report outlining the aforementioned design parameter, costs and <br />regulatory compliance assessment will be prepared. A draft Table of Contents follows: <br />• Introduction <br />• Project Descriptions <br />• Conceptual Site Layouts <br />• Estimated Costs of Construction <br />• Environmental and Regulatory Issues <br />• Recommendations for Next Steps <br />• Summary <br />Deliverables <br />• Draft Conceptual Design Report for review <br />• Final Conceptual Design Report <br />• Final electronic version of Conceptual Design Report in pdf format <br />20D-9
The URL can be used to link to this page
Your browser does not support the video tag.