My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25E - AGMT - STORM DRAIN CLEANING
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
07/15/2013
>
25E - AGMT - STORM DRAIN CLEANING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2013 1:51:32 PM
Creation date
7/11/2013 11:08:13 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25E
Date
7/15/2013
Destruction Year
2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />All vehicles used during the catch basin inspection and cleaning process will be equipped with <br />traffic control lights, traffic cones and traffic delineators for worker safety and limit traffic <br />delays. <br />Ocean blue will submit a traffic control plan compliant with the Department of Transportation to <br />the City of Santa Ana prior to the commencement of any work performed. <br />Ocean Blue will be able to perform the inspections of all catch-basins with in a seven day notice <br />to proceed from the City if Santa Ana. <br />During the removal of existing manhole covers Ocean Blue will inspect rings and cover lids for <br />cracks and defects. Ocean Blue will replace any missing or damaged screws or bolts at no <br />additional cost to the city of Santa Ana. <br />During the inspection process Ocean Blue will log and photo the condition of each catch basin <br />inside and outside prior to any work. <br />After photographing the condition of each catch basin Ocean blue will remove all trash and <br />debris found in front of curb opening or on ARS Inserts. <br />Ocean Blue will remove all vegetation growing across and or blocking the opening. <br />Ocean Blue will provide a detailed report that describes the physical condition of each catch <br />basin. <br />Items included in the inspection report for each catch basin will include the following. <br />Photos of the catch basin before cleaning / inspection and after cleaning <br />• Date of inspection <br />2 <br />25E-13
The URL can be used to link to this page
Your browser does not support the video tag.