Laserfiche WebLink
c) Pavement pressure washing - Contractor shall perform pressure washing <br />quarterly (second week of January, April, July and October) to remove <br />dirt, stains, gum, tar, etc. from all paved pedestrian surfaces including <br />sport courts, sidewalks, picnic pads, and paved areas around buildings. <br />d) Site amenity cleaning - Contractor shall perform pressure washing of site <br />amenities, such as but not limited to, picnic tables, park benches, skate <br />park, walls, planters, raised curbing, railing, exterior of buildings, <br />overhead shelters, etc. <br />(1) All picnic amenities (picnic tables, b.b.q.s, picnic shelters, etc.) and <br />park benches shall be wiped clean every day Monday through <br />Sunday to assure that all trash, stains, spills, debris, glass, staples, <br />nails, tape, wire, etc. is removed. <br />(2) All picnic concrete paved areas and b.b.q.'s, park bench areas, patio <br />areas, and areas adjacent building entrances shall be cleaned once a <br />month using high pressure cleaning equipment. <br />(3) All barbecues shall have ashes, charcoal or any other materials <br />removed once a week. Contractor shall paint the exterior of the <br />b.b.q.'s and the post with heat and rust resistant flat black paint <br />whenever rust appears. <br />e) All parks with flagpoles shall have an American flag displayed at all <br />times. The Contractor shall visually inspect the flag every day to assure it <br />is in good condition. Should, in the opinion of the Director, the flag not <br />be in good condition (faded, discolored, torn and/or having holes) <br />Contractor shall immediately request from the Director a new flag. <br />Contractor shall raise the new flag immediately upon receipt from the <br />Director. <br />f) Drinking fountains shall be cleaned, sanitized and unplugged on a <br />continuous basis. The Contractor shall use approved germicidal cleaner <br />and products to assure that drinking fountains are clean and polished. <br />The Contractor shall remove all mineral build up, algae, stains, etc. The <br />Contractor shall achieve this level of quality using a combination of <br />cleansers, metal polish product, hand and/or power tools. Should the <br />drinking fountain be so plugged that dismantling the fountain is required <br />the Contractor shall notify the Director immediately so City staff can <br />make the repair. <br />9. Playground/Tot-Lot Areas <br />a) The Contractor shall provide maintenance of all playground/tot-lot sand <br />and rubberized areas once a week. Maintenance shall include, but not <br />25A-32