My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25A - AGMT - LANDSCAPE MAINTENANCE
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
07/15/2013
>
25A - AGMT - LANDSCAPE MAINTENANCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2013 1:47:11 PM
Creation date
7/11/2013 1:35:35 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Parks, Recreation, & Community Services
Item #
25A
Date
7/15/2013
Destruction Year
2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(3) Level fence line areas using a rock or leveling rake. <br />(4) Level and drag warning track areas using nail drag followed by <br />finishing drag mats. Contractor shall apply new brick dust to fence <br />lines and warning tracks as necessary to maintain consistent ''/2" layer <br />of brick dust in these areas. <br />c) Weekly Maintenance <br />(1) Contractor will then edge the fence lines and warning track to <br />achieve crisp straight lines and a smooth crisp arc where the <br />brickdust warning track meets the sport turf. <br />d) Annual Maintenance <br />(1) Top dress outfield turf using Santa Ana mix or approved product. <br />Apply with an approved top dressing machine that will achieve a <br />level playing surface. (The "Santa Ana Mix" is sold by AG Organic, <br />Riverside. The specification is: AG Organic Company Organigro <br />Seed Topdress premixed w/California Organic Fertilizer, Inc. Phyta <br />Boost Plant Food 7-1-2 (33cy of Organigro Seed Topdress +700#'s <br />7-1-2 Phyta Boost per Acre)). <br />e) Non-recurring maintenance: <br />(1) During inclement weather the Contractor shall work to reopen <br />baseball fields as soon as possible. The Contractor shall use <br />Diamond Dry or an approved equal to warning tracts and fence lines. <br />In addition, the Contractor shall use hand pumps or any other <br />reasonable method necessary to drain water off the field. <br />11. Soccer /Football Field Maintenance <br />a) All soccer/football fields shall be inspected every day, Monday through <br />Friday. Contractor shall look for divots, depressions, debris, and other <br />turf marring conditions. If discovered, the Contractor shall fill in divots <br />and depressions with #20 white silica sand mixed with Stovers Bermuda <br />Dunes grass seed during the spring/summer and Stovers Grand Slam <br />perennial rye grass seed during the fall winter to re-establish the areas. <br />b) Areas of the field where turf has been worn away due to play shall be <br />raked, dragged and leveled each day to provide a level-playing surface <br />free of divots, depressions and uneven surfaces. The Contractor shall add <br />approved topsoil to these areas as necessary to keep the areas level and <br />safe. <br />25A-34
The URL can be used to link to this page
Your browser does not support the video tag.