Laserfiche WebLink
10.0 Work to be Completed "ANNUALLY" <br />10.1 Each year, the following renovation is to be done on all fields in conjunction with <br />the City's Annual Sports Turf Renovation Schedule. Fields renovated may <br />change from year to year. <br />10.1.1 Contractor shall laser grade each ball diamond. Contractor shall <br />scarify drag built up amounts of materials at high spots and cut and <br />level drag the scarified material to low spots. The Contractor shall <br />fill any remaining low spots with new Gail Materials "Pro Gold <br />with Stabilizer" brickdust from stock and make level. <br />Note: Staff shall identify areas to scarify/cut and level <br />drag at the November meeting with contractor's <br />owner (as per section 6.3 of contract). <br />10.1.2 Contractor shall verify all base distances, pitching rubber distances <br />and pitching mound heights per the Little League, Pony/Colt <br />League specifications for each specific field. Contractor shall <br />repair any specifications not being met on any field. <br />10.1.3 In addition, contractor shall install 1/2" new Gail Materials "Pro- <br />gold with Stabilizer" (brickdust) to in-fields at all diamonds <br />(minimum 26 tons per Girls Softball/Major Little League Field and <br />minimum 40 tons per Junior/Senior Little League Field). Also, the <br />contractor shall install a minimum of 1 ton of Turface calcite clay <br />per Girls Softball/Major Little League Field and 2 tons of Turface <br />calcite clay to Junior/Senior Little League Fields Responsibility for <br />and purchase of necessary materials shall be at contractor's <br />expense. <br />Note: The City has the right to move brickdust and <br />Turface materials to other infields under this <br />agreement should they decide that an infield or <br />infields do not require additional materials a <br />particular year. <br />11.0 Work To Be Completed "AS DIRECTED" <br />11.1 Replace Base ANCHORS as directed. <br />Note: City of Santa Ana use's the Roger's Breakaway <br />base anchoring system. Contractor shall install base <br />anchors into the ground per manufacturer's <br />standards. Top of stake shall be approximately 2" <br />25A-44