My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ACIRE, INC.-2013
Clerk
>
Contracts / Agreements
>
A
>
ACIRE, INC.-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2021 2:37:38 PM
Creation date
7/22/2013 2:26:41 PM
Metadata
Fields
Template:
Contracts
Company Name
ACIRE, INC.
Contract #
A-2013-087
Agency
PUBLIC WORKS
Council Approval Date
6/3/2013
Insurance Exp Date
7/6/2017
Destruction Year
0
Document Relationships
ACIRE, INC. (2)-2017
(Amended By)
Path:
\Contracts / Agreements\A
ACIRE, INC. 1A
(Amended By)
Path:
\Contracts / Agreements\A
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
development functions. His primary focus Is serving both clients and prospective customers by listening <br />to their needs and communicating their visions in a clear manner across other company departments. <br />Kerry Berlin, Manager- Displays, Technology and Sustainable initiatives, Tolar Project Manager <br />Kerry Berlin joined Tolar in June of 2007 to launch the company's new Displays and Directories Division. <br />He is an experienced professional with 20 years' experience in sales and sales management, including <br />nine years in the advertising and manufacturing industries related to displays and directories and three <br />years as regional sales manager with a leading international outdoor advertising firm. Kerry is tasked <br />with business development and product development to meet the demands of the retail and public <br />venue markets. In addition Kerry leads the sustainable initiative team at Tolar Manufacturing with <br />responsibility for identifying reliable LED lamping, alternative power supply and recycled or recyclable <br />materials used in the manufacturing process. <br />Eli Meza, Engineering Manager <br />Eli has a wealth of knowledge and experience in engineering, systems and design. An AutoCAD user <br />since high school, he joined Team Tolar is 2007 as the lead designer and has grown his resume while <br />responsible for the design and development of many distinctive street furniture projects. In the fall of <br />2012 that experience, including his unique ability to mentor and grow the engineering team, led to his <br />promotion to engineering manager. Ell's experience, in addition to being an award winning transit <br />shelter designer (Auto Desk IOM 2012) includes 15 years in the automotive industry in the area of <br />aftermarket accessories. Being able to design a product and follow it through design, fabrication and <br />installation gives me a great deal of pride. Eli leads a six -person engineering and design team, this team <br />is responsible for product integrity creating work orders based on customer specifications as well as <br />research and development. The engineering team, in support of the company president, also manages <br />the quality control process at Tolar Manufacturing. They also support the sales, operations and <br />purchasing departments. <br />Gabriel Guzman, Production and Inventory Control Manager <br />Gabriel joined the Tolar team in 2001 on the production floor and has continually progressed with the <br />organization. With a can -do attitude and a commitment to delivering to our customers a quality product <br />on a timely basis; Gabriel is responsible for production planning and inventory control. He leads a team <br />that Is responsible to ensure that our craftsmen have the tools and material they need to fabricate a <br />quality product for our customers and their respective stakeholders. <br />ache, the <br />
The URL can be used to link to this page
Your browser does not support the video tag.