My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ACIRE, INC.-2013
Clerk
>
Contracts / Agreements
>
A
>
ACIRE, INC.-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2021 2:37:38 PM
Creation date
7/22/2013 2:26:41 PM
Metadata
Fields
Template:
Contracts
Company Name
ACIRE, INC.
Contract #
A-2013-087
Agency
PUBLIC WORKS
Council Approval Date
6/3/2013
Insurance Exp Date
7/6/2017
Destruction Year
0
Document Relationships
ACIRE, INC. (2)-2017
(Amended By)
Path:
\Contracts / Agreements\A
ACIRE, INC. 1A
(Amended By)
Path:
\Contracts / Agreements\A
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cost Proposal <br />Below is Acire's cost proposal. <br />ITEM <br />DESCRIPTION <br />EQUIPMENT <br />UNIT <br />PRICE <br />QUANTITY <br />PRICE <br />1 <br />Model: BC-202 -12 bike secure parking system. <br />Includes glass panels, access control system, security <br />camera, wireless communications, one security door <br />and solar system. <br />$25,500 <br />2 <br />$51,000 <br />2 <br />Model: BC-300- 24 bike secure parking system. <br />Includes glass panels, access control system, security <br />camera, two security doors, wireless communications <br />and solar system. <br />$44,500 <br />1 <br />$44,500 <br />3 <br />Partition wall for BC-300 <br />$2,200 <br />1 <br />$2,200 <br />4 <br />Model: BC-D102 - Public Bike Maintenance Stand <br />$1,300 <br />3 <br />$3,900 <br />TOTAL EQUIPMENT <br />$101,600 <br />Tax <br />$9,144 <br />SERVICES <br />1 <br />Stamped/Certified Engineering Documentation <br />$1,200 <br />3 <br />$3,600 <br />2 <br />Site preparation and permitting <br />$8,000 <br />1 <br />$8,000 <br />3 <br />Structure installation -BC202 <br />$1,800 <br />2 <br />$3,600 <br />4 <br />Structure installation -BC300 <br />$3,600 <br />1 <br />$3,600 <br />5 <br />Construction - Concrete pad prep forming and <br />installation <br />$6,446 <br />3 <br />$19,338 <br />6 <br />Shipping of structures <br />$800 <br />3 <br />$2,400 <br />7 <br />Installation of bike stand <br />$300 <br />3 <br />$900 <br />8 <br />Project Management <br />$100 <br />60 Hours <br />$6,000 <br />TOTAL SERVICES <br />$47,438 <br />SUPPORT SYSTEM <br />One time <br />Cost <br />1 <br />BikeConnect Reservation and Management Platform - <br />Version 2.1 <br />$10,740 <br />1 <br />$10,740 <br />ANNUAL MAINTENANCE AND SUPPORT SERVICES <br />1 <br />Custodial, cleaning and maintenance services <br />$12,500 <br />Annual <br />$12,500 <br />2 <br />Web support <br />$9,600 <br />Annual <br />$9,600 <br />3 <br />800 Customer Support <br />$9,600 <br />Annual <br />$9,600 <br />Note. the construction and site preparation quotation assumes each site is free from utility, water or sewer <br />relocation and DOES NOT Include any demolition work. Costs will Increase !f arty of the proposed locations requires <br />work not quoted <br />ache, inc <br />
The URL can be used to link to this page
Your browser does not support the video tag.