My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23B - PROJ - REHAB BROADWAY AND WASHINGTON WATER MAIN IMPROVEMENTS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
08/05/2013
>
23B - PROJ - REHAB BROADWAY AND WASHINGTON WATER MAIN IMPROVEMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2013 10:48:50 AM
Creation date
7/31/2013 5:14:34 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23B
Date
8/5/2013
Destruction Year
2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contract Award for Broadway Rehabilitation (Pr. 11-6743) and <br />Broadway and Washington Water Main Improvements (Pr. 11-6415) <br />August 5, 2013 <br />Page 2 <br />associated with the older and deteriorated water mains will be eliminated, and water service <br />capacity and fire protection will be enhanced. <br />The Notice Inviting Bids was advertised on June 10 & 11, 2013, and bids were opened on July 8, <br />2013. A summary of the bid invitations mailed, bids received, and bid results are as follows: <br />Contractor Participation Data <br />Santa Ana Contractors receiving notices: 15 <br />Contractors requesting bidding documents: 14 <br />Bids received: 6 <br />Bids received from Santa Ana Contractors: 0 <br />Bid Results Summary <br />RANK BIDDER'S NAME LOCATION BASE BID <br />1 Christensen Brothers General Engineering, Inc. Apple Valley $4,302,858.65 <br />2 Lonerock, Inc. Irvine $4,569,883.00 <br />3 Sally-Miller Contracting, Inc. Brea $4,771,000.00 <br />4 All American Asphalt Corona $5,030,974.00 <br />5 Los Angeles Engineering, Inc. Covina $5,214,016.00 <br />6 Excel Paving Company Long Beach $5,329,910.40 <br />A total of six bids were received and all were deemed responsive, with Christensen Brothers <br />General Engineering, Inc. submitting the lowest responsive bid. Their $4,302,858.65 bid is 9.5 <br />percent higher than the $3,930,100 Engineer's Estimate. A subsequent review of the Engineer's <br />Estimate concluded that night work, which may be required due to the potential impact on traffic, <br />was not accounted for and resulted in a lower estimate. Staff has also begun to notice <br />construction costs trending up associated with greater construction activity. Nonetheless, staff is <br />confident that the current bids are very competitive and that the low bid represents a very good <br />price. <br />ENVIRONMENTAL IMPACT <br />In accordance with the California Environmental Quality Act, this project is exempt from further <br />review. Categorical Exemptions Environmental Review No. 2012-24 was filed for this project. <br />FISCAL IMPACT <br />The Project Cost Analysis (Exhibit 2) determined that the total funds needed to deliver the project <br />are $5,163,430.65. The total cost includes construction administration, testing, and <br />contingencies. <br />23B-2
The URL can be used to link to this page
Your browser does not support the video tag.